Laserfiche WebLink
CITY OF HUGO <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Project No. 01904-87 <br />Pay Voucher No. 4 <br />01904-87 <br />Proiect <br />Material Status <br />Quantity <br />Line <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />This <br />Amount This <br />Quantity <br />Amount <br />Quantity <br />Pay <br />Pay Voucher <br />To Date <br />To Date <br />Voucher <br />58 <br />2575.605 <br />HYDROSEEDING <br />SO YD <br />$0.44 <br />3000 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />59 <br />2582.502 <br />PASO LID LINE <br />L F <br />$1.20 <br />240 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />60 <br />2582.502 <br />6" SOLID LINE <br />PAINT <br />LF <br />$2.50 <br />60 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />61 <br />2582.502 <br />4" DBLE SOLID <br />LINE PAINT <br />L F <br />$1.00 <br />2750 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />Totals For Section SCHEDULE A - STREET IMPROVEMENTS: <br />$134,800.03 <br />$626,722.51 <br />SCHEDULE B - STORM DRAINAGE <br />62 <br />2104.501 <br />REMOVE SEWER <br />PIPE (STORM) <br />L F <br />$13.00 <br />490 <br />0 <br />$0.00 <br />400 <br />$5,200.00 <br />REMOVE <br />63 <br />2104.509 <br />DRAINAGE <br />EACH <br />$420.00 <br />3 <br />0 <br />$0.00 <br />3 <br />$1,260.00 <br />STRUCTURE <br />POND <br />64 <br />2105.607 <br />EXCAVATION <br />CU YD <br />$17.00 <br />1497 <br />0 <br />$0.00 <br />1497 <br />$25,449.00 <br />(EV) <br />65 <br />2501.515 <br />15" RC PIPE <br />APRON <br />EACH <br />$1,250.00 <br />4 <br />0 <br />$0.00 <br />4 <br />$5,000.00 <br />66 <br />2501.515 <br />18" RC PIPE <br />APRON <br />EACH <br />$1,180.00 <br />2 <br />0 <br />$0.00 <br />1 <br />$1,180.00 <br />TRASH GUARD <br />67 <br />2501.602 <br />FOR 12" PIPE <br />EACH <br />$300.00 <br />1 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />APRON <br />68 <br />2502.541 <br />6" PERF PE PIPE <br />DRAIN <br />L F <br />$14.00 <br />1400 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />12" RC PIPE <br />69 <br />2503.541 <br />SEWER DES 3006 <br />L F <br />$29.00 <br />199 <br />0 <br />$0.00 <br />199 <br />$5,771.00 <br />CL V <br />15" RC PIPE <br />70 <br />2503.541 <br />SEWER DES 3006 <br />L F <br />$30.00 <br />1084 <br />0 <br />$0.00 <br />1066 <br />$31,980.00 <br />CL V <br />18" RC PIPE <br />71 <br />2503.541 <br />SEWER DESIGN <br />LIN FT <br />$33.00 <br />836 <br />0 <br />$0.00 <br />836 <br />$27,588.00 <br />3006 CLASS III <br />CONNECTTO <br />72 <br />2503.602 <br />EXISTING STORM <br />EACH <br />$1,470.00 <br />4 <br />0 <br />$0.00 <br />5 <br />$7,350.00 <br />SEWER <br />73 <br />2503.602 <br />CHIMNEY SEALS <br />EACH <br />$150.00 <br />291 <br />10 <br />$1,500.00 <br />23 <br />$3,450.00 <br />CONST <br />74 <br />2506.501 <br />DRAINAGE STRUCTURE DES <br />L F <br />$320.00 <br />74 <br />0 <br />$0.00 <br />74 <br />$23,680.00 <br />48-4020 <br />CONST <br />75 <br />2506.501 <br />DRAINAGE STRUCTURE <br />STRUCTURE DES <br />F <br />$410.00 <br />15 <br />0 <br />$0.00 <br />14.9 <br />$6,109.00 <br />60-4020 <br />CONSTRUCT <br />76 <br />2506.502 <br />DRAINAGE <br />EACH <br />$1,550.00 <br />12 <br />0 <br />$0.00 <br />12 <br />$18,600.00 <br />STRUCTURE <br />DESIGN SPECIAL <br />Page 6 <br />