My WebLink
|
Help
|
About
|
Sign Out
Home
2016.11.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2016 CC Packets
>
2016.11.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 12:24:18 PM
Creation date
11/3/2016 12:17:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/7/2016
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. EXISTING CONDITIONS <br />3.1 Roadway <br />The roadways in the North Sunset Lake Area Street Improvement Project vary in street and <br />right-of-way widths. The total length of roadway included in the project is 15,700 feet or 2.97 <br />miles. <br />North Sunset Lake Area Street Improvement Project — Existing Conditions <br />Street Segment <br />From <br />To <br />Length <br />Existing <br />Width <br />Curb <br />Homestead Avenue North <br />137"' Street North <br />132nd Street North <br />3,350' <br />22' <br />None <br />Ho mestead Drive North/ <br />130 Street North <br />125th Street North <br />Cul-de-sac <br />3,700' <br />24' <br />None <br />132nd Street North <br />Henna Avenue North <br />Isleton Avenue North <br />6,650' <br />24' <br />None <br />126th Street North <br />Irish Avenue North <br />Cul-de-sac <br />2,000' <br />32' <br />Bituminous <br />The majority of the roadways were constructed between the mid-1980s and 1990. Since then, <br />pavement conditions have aged and are exhibiting distresses such as transverse and longitudinal <br />cracking, pavement rutting, and a fallen cross slope, with surfaces rated as fair to poor. <br />3.2 Drainage <br />Runoff is currently collected by the existing drainage ditches. Culverts are located across <br />sections of the roadways as well as across many of the driveways to convey runoff into adjacent <br />wetland areas. <br />3.3 Private Utilities <br />Private utilities that have facilities in or near the project area will be notified during the final <br />design phase of the project and will be requested to coordinate any necessary repairs and <br />replacements as needed at their cost. Private utility companies that have facilities within the <br />project area include the following: <br />■ Comcast (Cable) <br />■ CenturyLink (Telephone/Internet) <br />■ Xcel Energy (Electric/Gas) <br />3.4 Sanitary Sewer <br />The properties within the project area are served by private sanitary systems. There is not an <br />existing public sanitary sewer system in the area. <br />3.5 Water Main <br />The properties within the project area are served by private water systems. There is not an <br />existing public water system in the area. <br />Feasibility Report <br />North Sunset Lake Area Street Improvement Project <br />City of Hugo, MN <br />WSB Project No. 1904-930 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.