My WebLink
|
Help
|
About
|
Sign Out
Home
2016.12.19 ORD 2016-478 Fee schedule
Hugo
>
City Council
>
City Council Ordinances
>
2016 CC Ordinances
>
2016.12.19 ORD 2016-478 Fee schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:12:03 PM
Creation date
1/13/2017 9:12:37 AM
Metadata
Fields
Template:
City Council
Document Type
Ordinances
Meeting Date
12/19/2016
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF HUGO <br />2017 FEES, RATES AND CHARGES <br />ROADWAY RECONSTRUCTION/REHAB: <br />Single -Family Residential/Duplex Rates: <br />Complete Reconstruction <br />$ <br />5,200.00 <br />ESCROW <br />Partial Reconstruction <br />$ <br />FEES <br />AND <br />OTHER <br />PLANNING & ZONING RELATED (continued): <br />3,400.00 <br />per unit <br />Urban Roadway Overlay <br />$ <br />PLANNED UNIT DEVELOPMENT RELATED: <br />per unit <br />Rural Roadway Overlay <br />$ <br />1,800.00 <br />Planned Unit Development Application <br />UTILITY RELATED: <br />$800 + $20 per lot <br />$ <br />5,000.00 <br />Planned Unit Development Amendment <br />$ <br />325.00 <br />$ <br />2,500.00 <br />PROPERTY LINE RELATED: <br />20.00 <br />per day+ $2.20/thousand gallons <br />Sewer Infrastructure Fee (in lieu of assessment) <br />$ <br />Encroachment Agreements <br />$ <br />120.00 <br />$ <br />1,632.00 <br />Property Line Adjustment Application <br />$ <br />150.00 <br />588.00 <br />per SAC unit <br />REZONING RELATED: <br />$ <br />30.00 <br />Water Infrastructure Fee (in lieu of assessment) <br />Rezoning Application (less than 5 acres) <br />$ <br />540.00 <br />$ <br />1,000.00 <br />Rezoning Application (more than 5 acres) <br />$ <br />1,080.00 <br />$ <br />1,000.00 <br />Rezoning to Long -Term Agricultural <br />$ <br />135.00 <br />300.00 <br />SITE PLAN RELATED: <br />$ <br />800.00 <br />Water Meter Rental - Commercial - 2" Meter <br />Commercial or Industrial Site Plan <br />$ <br />350.00 <br />$ <br />5,000.00 <br />Farm Site Plan <br />$ <br />30.00 <br />$ <br />800.00 <br />Sketch Plan Review <br />$ <br />110.00 <br />750.00 <br />+ 2 WACs <br />STREET & ROADWAY RELATED: <br />Cost + 10% <br />+ WACs to be determined by City Engineer <br />Water Meter Testing <br />Street and Easement Vacation <br />$ <br />110.00 <br />$ <br />1,000.00 <br />SUBDIVISION RELATED: Payable with Preliminary AND <br />Final Plat Applications <br />Water Utility Permit <br />Minor Subdivision - Rural (3 lots or less) <br />$ <br />220.00 <br />$ <br />1,000.00 <br />Minor Subdivision - Urban (3 lots or less) <br />$ <br />220.00 <br />$ <br />2,000.00 <br />Subdivision - 4 to 15 lots <br />$ <br />540.00 <br />$ <br />5,000.00 <br />Subdivision - 16 to 30 lots <br />$ <br />700.00 <br />$ <br />10,000.00 <br />Subdivision - Over 30 lots <br />$23 per lot <br />$ <br />20,000.00 <br />VARIANCE RELATED: <br />Variance to Zoning Ordinance <br />$ <br />200.00 <br />Minor Deviations to Zoning Ordinance <br />$ <br />200.00 <br />PUBLICATIONS: <br />Audit/Comprehensive Plan <br />$ <br />55.00 <br />Municipal Code <br />$ <br />125.00 <br />Zoning Map <br />$ <br />7.00 <br />Zoning Ordinance <br />$ <br />65.00 <br />Other Publications <br />Cost + 10% <br />DVD Recordings <br />$ <br />10.00 <br />Official Newspaper <br />Exempt <br />PUBLIC WORKS RELATED: <br />Grass/Weed Mowing <br />$ <br />75.00 <br />first half hour (minimum charge) <br />Grass/Weed Mowing <br />$ <br />50.00 <br />each additional <br />hour or fraction thereof <br />Maintenace Worker (no equipment) <br />$ <br />58.00 <br />per hour <br />Maintenace Worker w/pickup truck <br />$ <br />88.00 <br />per hour <br />All Other Equipment w/operator <br />$ <br />150.00 <br />per hour <br />ROADWAY RECONSTRUCTION/REHAB: <br />Single -Family Residential/Duplex Rates: <br />Complete Reconstruction <br />$ <br />5,200.00 <br />per unit <br />Partial Reconstruction <br />$ <br />4,100.00 <br />per unit <br />Roadway Reclamation/Overlay <br />$ <br />3,400.00 <br />per unit <br />Urban Roadway Overlay <br />$ <br />2,100.00 <br />per unit <br />Rural Roadway Overlay <br />$ <br />1,800.00 <br />per unit <br />UTILITY RELATED: <br />Hydrant Water (per truck load) <br />$ <br />20.00 <br />Hydrant Meter Rental <br />$ <br />20.00 <br />per day+ $2.20/thousand gallons <br />Sewer Infrastructure Fee (in lieu of assessment) <br />$ <br />3,100.00 <br />per SAC unit <br />Sewer Infrastructure Trunk Fee <br />$ <br />1,632.00 <br />per SAC unit <br />Sewer Infrastructure (SAC) Fee <br />$ <br />588.00 <br />per SAC unit <br />Sewer Utility Permit <br />$ <br />30.00 <br />Water Infrastructure Fee (in lieu of assessment) <br />$ <br />3,100.00 <br />per SAC unit <br />Water Infrastructure Trunk Fee <br />$ <br />1,960.00 <br />per SAC unit <br />Water Infrastructure (WAC) Fee <br />$ <br />680.00 <br />per SAC unit <br />Water Meter Rental - Residential <br />$ <br />300.00 <br />Water Meter Rental - Commercial - 1&1/2" Meter <br />$ <br />800.00 <br />Water Meter Rental - Commercial - 2" Meter <br />$ <br />750.00 <br />Water Meter Rental - Commercial - Larger than 2" <br />Cost + 10% <br />Water Meter Rental - Irrigation - 1&1/2" Meter <br />$ <br />800.00 <br />+ 2 WACs <br />Water Meter Rental - Irrigation - 2" Meter <br />$ <br />750.00 <br />+ 2 WACs <br />Water Meter Rental - Irrigation - Larger than 2" <br />Cost + 10% <br />+ WACs to be determined by City Engineer <br />Water Meter Testing <br />$ <br />80.00 <br />Refundable if meter is faulty <br />Water Meter No -Access Penalty <br />$ <br />150.00 <br />Water Utility Permit <br />$ <br />30.00 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.