Laserfiche WebLink
L I I Ni ki <br /> LAKES <br /> t; Uj <br /> ! W <br /> 1 <br /> p(i tt , <br /> 2 i:t <br /> MAIN ST <br /> .rte' $ 47h STS <br /> 40 <br /> 84 <br /> 54, <br /> ENTERVILLE <br /> ,t <br /> LL <br /> .CEDAR ST. <br /> PLANNING UNDERWAY FOR CSAH 8/14 <br /> IMPROVEMENT PROJECT <br /> Washington County,Anoka County, the Cities of Hugo and The goal of the project is to provide a safe and efficient road- <br /> Lino Lakes, along with their engineering consultant TKDA, way that meets current and future traffic needs and mini- <br /> are conducting a study of the County State Aid Highway mizes social, environmental, and economic impacts. The <br /> (CSAR) 8/14 corridor between Interstate 35E (I-35E) and project construction cost is estimated to range from $4.5 <br /> Trunk Highway (TH) 61. Proposed improvements for this million to $6.5 million, with $3.6 million coming from <br /> major east-west connection to 1-35E include expanding to Federal funds and Washington County, Anoka County, <br /> four lanes and adding turn lanes, a center median, apedes- Hugo, and Lino Lakes providing the remaining funding. <br /> Irian/bicycle path, and new drainage systems. In addition, <br /> the following four realignment alternatives are being evalu- Public input has been a significant part of this project. <br /> ated with respect to CSAH 8/14's connection with TH 61 Three informational meetings have been held (January 15, <br /> (see map): 2002, April 23, 2002 and June 18, 2002), with over 100 <br /> people in attendance at each meeting. Public comment has <br /> 140th Street Alignment: Realigning been instrumental in developing and evaluating the realign- <br /> CSAH 8 to connect with TH 61 at mens alternatives. <br /> 140th Street. <br /> 142nd Street Alignment: Realigning Public meetings are also scheduled for City Council meet- <br /> CSAH 8 to connect with TH 61 ings in both Hugo and Lino Lakes in July, and for a final <br /> between 140th Street and existing public meeting in October. <br /> CSAH 8. <br /> i <br /> 145th Street Alignment Existing): For more information on the CSAH 8/14 improvement <br /> Maintaining the CSAH 8 align- project, visit the Washington County web site at <br /> ment along its existing location. www.co.washington.mn.us/trnsphdv/projects.htm or con- <br /> 147th Street Alignment: Realigning tact Chris Manthey, Design Coordinator, at (651) 430- <br /> CSAH 8 to connect with TH 61 at 4316. <br /> 147th Street. <br /> i <br /> 6 <br />