Laserfiche WebLink
OPEN GYM HELD AT <br /> . WELCOME <br /> HUGO SCHOOL <br /> li►EY1N HOPP, <br /> From now through the spring, the Hugo school gymnasium will be open BUILDING <br /> every Saturday from 1:00 - 5:00 p.m. for open recreation. The gym is open <br /> to all Hugo residents regardless of their school district. Open gym partici- INSPECTOR <br /> pants are required to pay a $1 entry fee to help defer costs. A gym supervi- <br /> sor will be provided; however, parents of children in fourth grade or younger Kevin Hopp began workas a <br /> must stay with their children. field inspector with the City <br /> The gym will be split into two sections: one side will be for pick-up games of Hugo's Building <br /> such as basketball or volleyball, and the other side will be for open activities Department on November <br /> such as jump roping, hula hoops or for playing games. Groups are welcome, 5, 2001, performing inspec- <br /> and tables will be provided on a first come, first served basis. <br /> tions on all types of build- <br /> One or two gym supervisors are still needed. Please contact Jeff Stottlemyer ings, additions,' and other <br /> at 651-407-7506 if you are interested. This program is sponsored jointly by construction in the City. <br /> the City of Hugo Park and Recreation Commission and the White Bear Kevin has worked extensively <br /> Lake Area Public School District Community Services & Recreation <br /> in the metro area for the last <br /> Department. <br /> 20 years in the heating and <br /> BUILDING PERMITS air conditioning business. <br /> He recently completed a <br /> Building permits are required in the City of Hugo for most home improve- two-year building inspection <br /> ment projects, including decks, porches, accessory structures (over 120 <br /> square feet), remodeling, finishing basements, additions, re-siding, and re- <br /> roofing. <br /> e- program at North Hennepin <br /> roof ng. Plumbing projects, such as water softener and water heater Community College. <br /> replacements, and heating and ventilation projects, such as furnace replace- <br /> ment, adding ductwork, or installing central air conditioning, also require <br /> City Permits. Electrical permits are issued by the Minnesota State Board of Kevin has lived in the metro <br /> Electricity. area since 1989, and since <br /> 1993 in a home 1-1/2 miles <br /> While a building permit does not necessarily guarantee the workmanship of south of Centerville in Lino <br /> your contractor, it does ensure that your project will be constructed accord- <br /> ing to nationally recognized standards designed to protect homes from Lakes. He and Connie, his <br /> structural collapse and fire. Review of permit applications also ensures that wife of four years, have two <br /> projects meet zoning requirements such as yard coverage, setbacks, and dogs, and he enjoys ice fish- <br /> building height. ing and many other outdoor <br /> A building permit that requires review of construction plans can typically be activities. <br /> issued by the Building Department within five working days. Other per- <br /> mits, including re-siding, re-roofing, and plumbing and mechanical work, The City of Hugo welcomes <br /> are normally issued upon receipt of a completed application. Fees vary <br /> Kevin to its City Hall team. <br /> depending on the type of permit. Fee schedules are available upon request. <br /> Contact the Building Department at 651-429-6676, ext. 1. <br />