Laserfiche WebLink
Beaver Ponds Park Water Reuse <br />Feasible Cost Recovery <br />— Credits available for City reconstruction BMP requirements <br />Credits available for land development BMP requirements <br />Sufficient Water Supply at Nearby Ponds <br />Sufficient Area for Expanded Irrigation and Infiltration <br />City -Owned Account <br />Achieves Drought Resilience <br />Approximate Irrigated Acres = 5.5 <br />Anticipated Irrigation Credits = 5.0 <br />Anticipated Infiltration Credits = 50.0 <br />A <br />WS <br />