My WebLink
|
Help
|
About
|
Sign Out
Home
2015.04.06 CC PowerPoint Stillwater SD Bond Request
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
City Council Meeting PowerPoints
>
2015 CC PowerPoints
>
2015.04.06 CC PowerPoint Stillwater SD Bond Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 4:17:28 PM
Creation date
2/16/2017 4:16:50 PM
Metadata
Fields
Template:
City Council
Document Type
PowerPoint Presentation
Meeting Date
4/6/2015
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Facility Improvements <br />Stillwater <br />AREA PUBLIC SCHOOLS <br />High school <br />Additional classroom spaces for ninth graders; remodel <br />$48,025,031 <br />science labs; upgrade music rooms and other learning spaces; <br />expand cafeteria and commons areas and improve <br />circulation; add physical education and gym spaces <br />Elementary schools <br />Reconfigure preschool classrooms; upgrade HVAC at Afton- <br />$9,809,250 <br />Lakeland, Lake Elmo, Lily Lake and Oak Park; upgrade <br />playground surfaces at all elementary schools <br />Construction of new 500+ student elementary school <br />$25,710,000 <br />Proceeds from the sale of Valley Crossing Community School <br />($9,030,000) <br />Other district <br />Upgrade to Pony Stadium entrance, restrooms, and <br />$7,868,438 <br />facility/site <br />concessions; addition of multi-purpose practice fields <br />improvements <br />Middle schools <br />Reconfigure to grades 6-8; remodel Oak -Land Junior High <br />$6,300,000 <br />science labs; HVAC upgrade at Oak -Land and Stillwater junior <br />high schools <br />Capitalized interest <br />Pay interest up front to save costs over time <br />$5,317,281 <br />Bus terminal <br />Construction of bus/maintenance garage (by discontinuing <br />$3,500,000 <br />current lease we would save about $225,000 annually to our <br />general fund) <br />Referendum Request (bond sale) <br />$97.5 million <br />
The URL can be used to link to this page
Your browser does not support the video tag.