Laserfiche WebLink
Bid Results <br />A total of 2 bids were received on May 21, 2015 <br />Lowest bid — Arnt Construction <br />Rice Lake Meadows <br />Finale Avenue (LaValle Fields) <br />Total <br />Engr Est. <br />$9861033.20 <br />$138,503.00 <br />$111241536.20 <br />$1,280,998 <br />A <br />WSJ" <br />� A�ruradrl. 1irc. <br />