Laserfiche WebLink
2010 <br />ja <br />Highways and Streets <br />Expenditures <br />2011 2012 2013 2014 <br />• Includes administration and <br />engineering, streets, and street <br />lighting <br />• Primarily supplies and street <br />materials <br />• Totaled $1,204,207 in 2014 and <br />$1,199,078 in 2013 — an increase of <br />less than 1 % <br />SNITTH �SCHAFER <br />� AYES LTV <br />C4,1"Ied PwWU •ocemitt ro 4n1 Consulrcn» <br />4 n ,YEARS <br />smithschafer.com �> 19 7 1 9 <br />