Laserfiche WebLink
Streets/Access <br />• Two main connections <br />• From the west, Everton Avenue <br />• Phase 1 <br />• From the north, Oneka Parkway <br />• Roadway easement <br />• Creek crossing <br />• Phase 2 <br />*The 2030 Comprehensive Plan shows Oneka <br />Parkway as a collector street from CSAH 8 to <br />140th Street. <br />• Not planned as a collector street through the <br />development, but remains to planned to extend to <br />140th street. <br />• Staff is working with the developer and <br />landowner for a construction access through <br />existing farm fields to minimize traffic and <br />roadway impact to Everton Avenue. <br />