Laserfiche WebLink
Storm Pond Maintenance <br />Inspection <br />It � <br />Facility Name: <br />Unique ID: <br />Weather: <br />STORMWATER POND MAINTENANCE INSPECTION FORM <br />Date: Time: <br />Inspector: <br />Type of BMP: reuse pond filtration/ infiltration pond rain garden pond/wetland <br />Scoring Breakdown <br />N/A = Not Applicable 1 = Monitor (potential future problems) Comment Area <br />N/I = Not Investigated 2 = Routine Maintenance Required repairs required <br />O = Not a Problem 3 = Immediate Repair Required <br />Pond Information Rating <br />1. Outfall / Ditches, Channels from pond <br />Woody growth within 5, of outfall <br />N/A <br />N/1 <br />0 <br />1 <br />2 <br />3 <br />Outfall ditch/channel functioning <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Manholes, frames, and covers <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Release water under cutting outlet <br />N/A <br />N/1 <br />0 <br />1 <br />2 <br />3 <br />Erosion <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Displaced energy dissipater (rip rap) <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Excessive sediment deposits <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Vegetation <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Other <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />2. Embankments and Emergency Spillways <br />Cracking, bulging, sloughing <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Erosion and or material loss <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Animal burrows <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Soft spots <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Vegetation <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Obstructions/ debris <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Woody growth or unauthorized plantings <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Other <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />3. Weir/ Trash Guard / outlet Structure <br />Structure condition <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Debris removal necessary <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Corrosion <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />4. Spillway/ Outlet Structure <br />No. Outlets: Size <br />RCP <br />CMP <br />PVC <br />HDPE <br />Met <br />Mas <br />Orifice size <br />RCP <br />CMP <br />PVC <br />HDPE <br />Met <br />Mas <br />Concrete spalling <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Joint failure <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Leaking <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Corrosion <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Pipe alinement <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Structure access <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />Sediment accumulation <br />N/AN/I <br />0 <br />1 <br />2 <br />3 <br />Other <br />N/A <br />N/I <br />0 <br />1 <br />2 <br />3 <br />