Laserfiche WebLink
Weather Adjustment Protocol for Expected Deliveries <br />For any two-year Measurement Period respecting application ofthe Performance Guarantee, <br />Expected Deliveries shall be adjusted to reflect any negative difference (shortfall) between <br />Expected Solar Irradiation ("ESP') and Actual Solar Irradiation ("ASP'). The ratio of ASI to ESI <br />for the Measurement Period shall be applied to Expected Deliveries as a weather adjustment <br />prior to comparing Actual Deliveries to Expected Deliveries for the purposes of the Performance <br />Guarantee. <br />The method of the weather adjustment is as follows. <br />1. The ESI for the Facility is 1390 KWh per square meter. <br />2. The ASI is to be determined by monthly pyranometer readings at the Facility. The <br />monthly readings are to be averaged for each of the two calendar years in the <br />Measurement Period. <br />3. The weather adjustment factor for the measurement period is the ratio of (i) ASI, <br />determined per Step 2 of this method to (ii) ESI, determined per Step 1 of this method. <br />The Expected Deliveries for the Measurement Period is multiplied by this factor to derive <br />the Guaranteed Performance. <br />26 <br />