Laserfiche WebLink
14 miles of additional <br />dedicated guideway <br />Doubles the travel time <br />(38 to 65 minutes) <br />13% increase in <br />ridership <br />70% increase in <br />construction cost <br />37% increase in O&M <br />cost <br />7,000 <br />6,000 <br />5,000 <br />4,000 <br />3,000 <br />2,000 <br />1,000 <br />6,100 <br />$1,100 <br />$1,200 <br />5,400 <br />$1,000 <br />$800 <br />90002 <br />Ridership <br />+700 riders <br />$600 <br />$400 <br />$200 <br />Y <br />N <br />J <br />LL <br />0 <br />CQ <br />CQ <br />a <br />m <br />O <br />Construction <br />Cost (millions) <br />+$450M cost <br />/gush <br />Z7WejO <br />