My WebLink
|
Help
|
About
|
Sign Out
Home
2017.05.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.05.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 1:33:47 PM
Creation date
5/12/2017 11:58:47 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/15/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2017 - <br />Page 2 of 2 <br />b. The stormwater ponding fee is not required. This was paid at the time the regional basin was <br />constructed. <br />c. All development fees shall be paid. <br />d. The applicant shall pay the City's Stormwater trunk fee. <br />e. The applicant shall pay the City's sewer and water trunk fees and SAC and WAC fees for the lot. <br />Miscellaneous <br />a. Sewer and water stubs should be verified by the applicant before any development occurs on site. <br />If the stubs are not present, the contractor is to coordinate the connection and any corresponding <br />permitting with the City to excavate in the City street and with Metropolitan Council <br />Engineering Services to connect to the MCES interceptor. <br />b. A complete set of revised plans addressing the conditions of approval shall be submitted for city <br />approval. <br />4. Prior to issuance of a certificate of occupancy, the applicant must comply with the following <br />conditions: <br />a. The applicant shall be required to draft and execute a stormwater drainage and maintenance <br />agreement between the two parcels whom share a drainage outlet. This shall be reviewed by <br />City staff. <br />b. The roof top mechanical equipment must be screened from view of adjacent properties. <br />c. All landscaping shall be fully installed. <br />5. At the time of future expansion, a site plan application will be required to be reviewed and approved <br />by the City. <br />ADOPTED by the City Council this 15th day of May 2017. <br />Tom Weidt, Mayor <br />ATTEST: <br />Michele Lindau, City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.