My WebLink
|
Help
|
About
|
Sign Out
Home
2017.04.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.04.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:53:30 PM
Creation date
5/12/2017 1:58:31 PM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
4/17/2017
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />■ VB <br />�M <br />April 12, 2017 <br />Honorable Mayor and City Council <br />City of Hugo <br />24669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: North Sunset Lake Area <br />Street Improvement Project <br />S.A.P. 224-123-001 / 224-109-001 <br />City of Hugo, MN <br />WSB Project No. 1904-930 <br />Dear Mayor and Council Members: <br />477 Temperance Street I St. Paul, MN 55101 1 (651) 286-8450M <br />Bids were received for the above -referenced project on Thursday, April 6, 2017, and were opened and <br />read aloud. Five bids were received. The bids were checked for mathematical accuracy and tabulated. <br />It should be noted that the project was bid with a Base Bid and two Bid Alternates for the types of oil used <br />on the bituminous surfacing. The recommended basis of award is the Base Bid plus Bid Alternate 1. <br />Please find enclosed the bid tabulation indicating the low bidder as T.A. Schifsky & Sons, Inc., North St. <br />Paul, Minnesota, with a total bid in the amount of $1,273,990.06 (Base Bid plus Bid Alternate 1). The <br />Engineer's Estimate for the project was $1,430,849.75. <br />We recommend that the City Council consider these bids and award a contract for the Base Bid plus Bid <br />Alternate 1 in the amount of $1,273,990.06 to T.A. Schifsky & Sons, Inc. based on the results of the bids <br />received. <br />If you have any questions, please contact me at (651) 286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark A. Erichson, PE <br />City Engineer <br />Enclosures <br />cc: Scott Anderson, City of Hugo <br />Steve Duff, City of Hugo <br />Rob Stangler, T.A. Schifsky & Sons, Inc. <br />jrs/srb <br />0 <br />Building a legacy —your legacy. <br />Equal Opportunity Employer I wsbeng.comm <br />K:101904-93014dminlConstruction AdmW 1904-930 CST LTR RECMMDTN-hmcc-04121 Tdocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.