Laserfiche WebLink
City of Hugo <br />Hugo Fire Station <br />5323 140`ti Street North, Hugo, MN <br />ROOF <br />SPEC01. INC <br />July 13, 2017 <br />Page 4 <br />RSI Proposal #P17-12595-02 & 03 <br />INDEMNIFICATION AND WAIVER <br />RELATING TO ASBESTOS <br />In engaging Roof Spec, Inc. to consult on the project which is the subject of the Contract between the parties, the <br />Owner/Client, acknowledges that Roof Spec, Inc. is not contracting to discover, contain, or clean up asbestos or <br />asbestos containing materials ("ACM"). The Owner/Client also agrees that, although asbestos or ACM may be <br />encountered in the roof system or parts of the roof system and areas adjacent thereto, and although activities by <br />Roof Spec, Inc., its employees, agents, or subcontractors (including but not limited to, sampling, and corrective <br />work) may disturb asbestos in the roof system or in other parts of the building of which the roof system is a part <br />and cause such asbestos or ACM to be a hazard, the Owner/Client (i) will not hold Roof Spec, Inc. liable under <br />any legal theory including those based upon any failure to discover or to attempt to discover the presence of <br />asbestos or ACM, failure to contain, remove, or clean up asbestos or ACM or any other act of omission arising <br />from the presence of asbestos or ACM (including disturbing any such presently existing materials); and (ii) will <br />defend and indemnify, to the greatest extent allowable under the law, Roof Spec, Inc., its director, officers, <br />employees, agents, successors and assigns against, and hold them harmless from and in respect of, any claim, <br />demand, loss, liability, cost, or exposure, including, but not limited to, reasonable attorney's fees and property <br />damage related to the presence of asbestos or ACM in the building, or any disturbance of the same, excepting <br />only claims by employees, agents, or subcontractors of Roof Spec, Inc. <br />In the event Roof Spec, Inc., learns of the existence of asbestos or ACM in connection with its work, Roof Spec, <br />Inc.'s sole obligation is to use diligent efforts to notify Owner/Client of the existence of materials. Roof Spec, <br />Inc. shall have the right to discontinue its work and remove its employees from the project (or that portion of the <br />project in which such materials were encountered), without any monetary or time penalty, until those materials (or <br />any hazards related thereto) are abated, encapsulated or removed, and/or it is determined that no hazard exists. <br />This indemnification and waiver shall govern over conflicting or inconsistent clauses of the General Contract, <br />general conditions of the contract, special or supplementary conditions, technical conditions, plans and <br />specifications. <br />