My WebLink
|
Help
|
About
|
Sign Out
Home
2008.01.22 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2008 EDA Packets
>
2008.01.22 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2017 10:08:11 AM
Creation date
9/1/2017 10:08:10 AM
Metadata
Fields
Template:
Commissions
Meeting Date
1/22/2008
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT-12/27/07 <br /> PARKS, TRAILS AND OPEN SPACE PLAN (CHAPTER 7) <br /> IMPLEMENTATION STRATEGIES <br /> No. Description Timing <br /> 6 Dog Park. Complete a study of dog park standards and identify <br /> locations for a possible dog park. The City should work to acquire land Short <br /> for use as a dog park. <br /> 7 Sunset Lake Access. Complete a study of the Sunset Lake park <br /> parcels currently owned by the City and options for the planned park <br /> on the lake. Establish which parcel will be used as the primary park Medium <br /> land and research options for sale or alternative use of the other <br /> parcel. The development of the park land may be development driven. <br /> 8 Downtown Park. Consider options for a new public park on Egg Lake <br /> in Downtown Hugo. A park plan should be prepared and an Medium <br /> implementation plan adopted. <br /> 9 Community Park. Consider possible locations for a community park <br /> in northern Hugo. The acquisition and development of this park may Medium <br /> be development driven. <br /> 10 Community Park. Prepare development options for an expanded <br /> Lions Park community park in Downtown. This could include Medium <br /> acquisition of additional land. <br /> 11 Trail Crossings. Plan for safe pedestrian crossings at key trail <br /> intersections. These trail crossings may be at grade trails, overpasses Medium <br /> or underpasses. Research possible funding sources grade-separated <br /> trail crossings at Highway 61. <br /> Transportation Plan <br /> The following implementation strategies will be used to carry out the Transportation <br /> Plan. <br /> TRANSPORTATION PLAN (CHAPTER 8) IMPLEMENTATION <br /> STRATEGIES <br /> No. Description Timing <br /> 1 Highway 61 Improvements. Cooperate with the Met Council, MnDot Ongoing <br /> and Washington County to fund and construct the following <br /> improvements: <br /> • Traffic control and intersection improvements at 147th Street <br /> • Traffic control and intersection improvements at 130th Street <br /> • Roadway, access, and intersection improvements between 140th <br /> Street and 150th Street consistent with the Downtown <br /> Transportation Plan <br /> 2 135 W/E Coalition. Continue to participate with the 1-35 W/E Coalition Ongoing <br /> to advance transportation initiatives along the 1-35W and 1-35E <br /> corridors, including reconstruction of the County Road 14 interchange <br /> and future interchange at County Road 4. <br /> Chapter 13 13-6 <br /> Implementation Plan <br /> ugo <br />
The URL can be used to link to this page
Your browser does not support the video tag.