My WebLink
|
Help
|
About
|
Sign Out
Home
2009.05.18 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2009 EDA Packets
>
2009.05.18 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2017 11:26:34 AM
Creation date
9/1/2017 11:26:34 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/18/2009
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit H <br /> Detailed Construction Costs <br /> Eden Builders <br /> Ken Anderson <br /> Carpenter Steak House 2-28-08 <br /> Section Companies Quotes <br /> Building permit $ 25,000.00 <br /> state plumbing review <br /> Sac/Wac $ 165,000.00 <br /> 1410 Testing $ 7,150.00 <br /> 1500 Temp.Conditions <br /> Site Supervisor $ 89,000.00 <br /> Project Manager $ 15,000.00 <br /> General liablility Insurance $ 22,000.00 <br /> Office/Accounting $ 22,000.00 <br /> Satellite toilets $ 1,500.00 <br /> dumpsters $ 8,000.00 <br /> telephones $ 1,500.00 <br /> site fence $ 5,750.00 <br /> job trailer $ 2,500.00 <br /> layout/labor $ 10,000.00 <br /> Dust control/safety $ 8,500.00 <br /> Rental equipment $ 10,000.00 <br /> Heat and Cover $ 20,000.00 <br /> 1710 Cleaning $ 10,000.00 <br /> 1720 Surveying $ 10,000.00 <br /> Site work included <br /> 2100 Site clearing/demo/Earthwork $ 40,000.00 <br /> Demo extra $ 10,000.00 <br /> 2220 Earthwork <br /> Utility Sewer Tie in $ 43,000.00 <br /> Water included <br /> Storm sewers included <br /> 2530 Plant-mixed Bituminous $ 132,000.00 <br /> 2730 Concrete Curb and Gutter $ 13,450.00 <br /> 2765 Pavement Markings included <br /> 2775 Concrete Walks included <br /> 2920 Turf Establishment $ 30,000.00 <br /> 2930 Exterior Plants included <br /> Retaining wall included <br /> Irrigation $ 20,000.00 <br /> 3000 Concrete $ 90,000.00 <br /> Masonry included <br /> 5400 Coldformed Metal Framing $ 124,500.00 <br /> 5500 Metal Fabrications $ 95,160.00 <br /> Miscellaneous metals $ 18,974.25 <br /> Sheet metal work included <br /> Erectors $ 26,250.00 <br /> 6105 Rough Carpentry $ 15,000.00 <br /> Finish carpentry $ 13,275.00 <br /> Cement board sheeting $ 6,000.00 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.