9111iMralrr atetb, ugust 10,2007
<br /> ORDINANCE NO.988
<br /> AN ORDINANCE ESTABLISHING PERMIT FEES -- --TO BE COLLECTED BY THE
<br /> CITY OF STILLWATER v"- permit Per^ by ihebuildingm °hal
<br /> 8 al l expire by limitation and
<br /> and void If the building or work sull honied by such permit is not commenced
<br /> The City Council d the City of Stillwater does ordain: .n 180 days from the dale of such permit,or If the building or work authorized by such
<br /> psmhit is suspended or abandoned at any time after the work Is commenced for a ped-
<br /> 1. Anew Section 33.4 fa hereby adopted to hereafter read as follows: od d 180 days. Before such work can be recommenced, a new permit shall be first
<br /> obtained to do so'and the tee therefore shall be one had the amount required for a new
<br /> PERMIT FEES.The applicant fora permit shall provides f estimated con-
<br /> Pew s
<br /> stnktloh value at the time d application,except for fixed fees.Permit valuations shell or eo In Pis and for such work
<br /> include total value of all construction work,including materials and labor,for which the work,excluding review fee,provided no changes neve been made
<br /> permit is being issued,such as gas,mechanical,plumbing equipment,and permanent The building official may grant,in writing,one or more extensions of time,for perlode not
<br /> systems.The building official shall make the final determination of value, more than 180 days each.The extension shall be requested in writing and justifiable
<br /> Valuation Is based on the building valuation data,dated May of 2004 or the most current Cause demonstrated.
<br /> valuation provided by the ICC via State of Minnesota Building Codes and Standards EXPIRATION OF PLAN REVIEW.Applications for which no permit Is Issued within IW
<br /> Division or Contract bid price.The building official shall make the final determination. days following the date of application shall expire by limitation,and plans and other data
<br /> subrllted for review may thereafter be returned to the applicant or destroyed by the
<br /> Etosptions:Building permit valuations for the following structures shall be based on the big official.In order to renew action on an application after expiration,the applicant
<br /> valuation of on-site wok only: shill resubmit plane and pay a new plan review fee.In the eventof a hardship and at the
<br /> a. Manufactured homes containing a Housing and Urban Devebprmenn(HUD) discretion of the building oficial a new pian review fee may be waived.
<br /> certification label; BUILDING PERMIT FEES
<br /> bi, Prefabricated buildings with a Minnesota Building Codes and Standards TOTAL VALUATION FEE
<br /> Division prefabrication label;and $1.00 to$500.00 $23.00
<br /> c. Industrialized/modular buildings with an IndustrializednoMs
<br /> Industrialized Building Corefmh $23.50 for the first$500.00 plus$3.05 for each
<br /> (IBC)label. additional$100.00,or fraction thereof,to and
<br /> PLAN REVIEW FEES.When submittal documents are required by the build- $M.00 10 a0w.00 Including
<br /> uild- Including$2,000.00
<br /> Ing ollicial,a plan review fee shall be paid.Said pian review fee shall be 65 percent d b 52 000.00
<br /> to buk khg permit fee.The plan review fees are separate fees from the permit fan And addit$69.25tonal are first$2,000.00 plus$14.00 for each
<br /> *a In addition to the pemit fees.When submittal documents are Incomplete or clanged Including
<br /> 25,x10.00,or fraction thereof,b and
<br /> W as o require additional platin review, fees shall be charged at the rate shown in Including$25,000.00
<br /> Bualtdktg Permit Fee Table.' Plan review fees for similar plans failing under 1300.0160, **,00140 t0*50,000:00 $391.25 for the first$25.000.00 plus$10.10 for each
<br /> ahbpart 5,shall be 25 percent of the building permit fee. a additional$1,000.00,or fraction thereof,to and
<br /> RXED FEES Including$50,000.00
<br /> PLUMBING PERMIT $50,1x11.00 to$100,000.00 $643.75 for the first$50,000.00 plus$7.00 for each
<br /> additional$1,000.00,or fraction thereof,to and
<br /> COMMERCIAL: 1%of bid plus state surcharge. including$100,000.00
<br /> MINIMUM: $49.50 plus state surcharge
<br /> RESIDENTIAL: $ 7.00 per opening plus state surcharge $100,001.00 td 5500,000.00 $993.75 for the first$100,dOd.00 plus$5.60 for each
<br /> MINIMUM: $49.50 plus state surcharge $1,000.00,or fraction ihered,to'and Yldudfrrg
<br /> $500,000.00
<br /> Walw Softeners: $15.00 plus state surcharge. 5500,001.00 to$1,000,000.00 $3,233.75 for the first 5500,000.00
<br /> Alio f4.76 ler
<br /> Sewer and Water: $49.50 plus state surcharge. each Additional$1,000.00,or inaction thsreol,band
<br /> MECHANICAL PERMIT FEES including$1,000,000.00
<br /> COMMERCIAL: t%d bid plus state surcharge $1,000,001 AO and up $5,608.75 for the first$1,000,000.00 plus$2.15 for
<br /> •
<br /> MINIMUM: $49.50 plus state surcharge each additional$1,000.00,or fraction tftered
<br /> Other Ihepecttons and Fees:
<br /> RESIDENTIAL: 1. Inspections outside of normal business tours $47.00 par hour'.
<br /> 5.8
<br /> NBTALLDIG BOTH HEAT AND AL4 CONDITIONING ON THE SAME PERIf1'. 2 Refnspeotlon Nes assessed Ander provisions d Section 30
<br /> Kieft plant $49.50 $
<br /> 447.7.
<br /> 00
<br /> no 3. inspect
<br /> AAIr aondttioning $Moo Plus State surcharge brheYor vNhich fee a spedficdy Indicated 547.00 per hour'
<br /> (rdnImurh charge-w*4mlt hour)
<br /> OF IIBTAIL JNG EITHER HEAT OR AIR CONDITIONING: 4. Additional plan review required by changes,addMlons
<br /> Hsslfrp plant ONLY: $49.50 plus state surcharge or revislons to plan $47.00 per four'
<br /> Air conditioning ONLY:$49.50 plus state surcharge 5. For use of outside consultants for plan checking and
<br /> Cos
<br /> 'Heating pent Includes fireplaces $60.00 ion'or both AotwMts••
<br /> Miecollarbous work such as duct work,new gas line,etc,has the minimum fee applied
<br /> Or the total hourly coat to the WAedictlon,whichever is the greatest.Tl1M rlDet ahaA
<br /> WORK COMMENCING BEFORE PERM ISSUANCE If work for which a permit is include supervision, overhead, equipment, hourly wages and fringe befhawta-of 1tN
<br /> wriplayses Involved.
<br /> required try the code has been commenced without first obtaining a pemnit,a special »Auld oats Include administrative and overhead costs.
<br /> Investigation shall be made before a permit may be issued for the work.An Investigation
<br /> fee shall be collected and is in addition to the required permit fee,and equal to the per-
<br /> MR in. Emoted by the City Council of the City of Stillwater this 7th
<br /> day of August 2007.
<br /> FOE REFUNDS.The building official may authorize refunding of any fees paid there CITY OF STFLLWA11!R
<br /> under which was erroneously paid or collected. Ken
<br /> H&rVq*l,Mow811-percent
<br /> �40"hg,ofecal MAY"
<br /> rip Ai�krSHPfp tli4R, d t�,�tNt Afles<:Diane F.want,Cay C1rrk
<br /> iy►e gf-Alan reuiaw tee ppb oq,hatprk ho been.tlone.und.a perms issued.The
<br /> building otfiaet shoe rat authorize refunding of any fee paid except on written applicaibn 111IM0
<br /> filed by the original pertnitee not later than 180 days after the date of fee payment.
<br /> REINSPECTIONS.A relrispection fee may be assessed for each inspection or re4nepec
<br /> ton when such portion of work for which Inspection Is called for Is not Complete or when
<br /> corrections called for are not made.
<br /> To obtain a reinspeotlon,the Permit applicant shall pay the relntpecton fee in m000r-
<br /> darloe with Building Penult Fee Tobe In the lee schedule adopted by this Muridpailty
<br /> M lnstanoes where nknpecdon fees have been assessed,no additional inspetxions of
<br /> the work will be performed unYl the required fen haus been paid.
<br />
|