My WebLink
|
Help
|
About
|
Sign Out
Home
2011.11.14 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2011 EDA Packets
>
2011.11.14 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2017 12:37:53 PM
Creation date
9/7/2017 12:36:06 PM
Metadata
Fields
Template:
Commissions
Meeting Date
11/14/2011
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warm air ducting or hot water heating system $ 20.00 <br /> Alteration of any warm air ducting or hot water system $ 10.00 <br /> Air conditioning—new or replacement $ 20.00 <br /> Wood burning furnace,stove or factory built fireplace per unit $ 30.00 <br /> (valuation based fee schedule to be used for masonry fireplace) <br /> Swimming pool heater per unit $ 30.00 <br /> Air exchanger $ 20.00 <br /> Gas or oil heater,fireplace,log and/or insert per unit $ 20.00 <br /> Other Equipment $ 30.00 <br /> Note: the minimum fee to be charged for a residential <br /> mechanical permit shall be$50.00* <br /> Commercial: 1.5 %of estimated job cost plus $ 75.00* <br /> *Note: A State Surcharge of one-half mill (.0005)of the fee or 50 cents,whichever amount is greater is <br /> charged on all fixed fee permits. <br /> OTHER INSPECTIONS AND FEES <br /> Inspections <br /> Inspections outside of normal business hours: $80.00 per hour with a two(2)hour minimum <br /> Reinspection fees: $55.00 per hour with a one(1)hour minimum <br /> Inspections for which no fee is specifically indicated: $55.00 per hour with a one(1)hour minimum <br /> Investigation Fee: Work Without A Permit <br /> Whenever any work for which a permit is required from the city has been commenced without first <br /> obtaining said permit,a special investigation shall be made before a permit may be issued for such <br /> work. An investigation fee,in addition to the permit fee,shall be collected whether or not a permit is <br /> then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee <br /> required by this code. The payment of such investigation fee shall not exempt any person from <br /> compliance with all other provisions of this code nor from any penalty prescribed by law. <br /> Plan Review Fee <br /> • When a building permit is required and a plan is required to be submitted,a plan review fee shall <br /> be paid. Plan review fees for all buildings shall be sixty-five percent(65%)of the building permit <br /> fee.The fee for similar plans shall be twenty-five percent(25%)of the normal building permit fee <br /> as defined in M.S.B.C. Section 1300. <br /> • The plan review fees specified are separate fees from the building permit fees specified and are in <br /> addition to the permit fees and are to be charged when a plan review is done even if the permit is <br /> not issued. <br /> • When submittal documents are incomplete or changed so as to require additional plan review,or <br /> when the project involves deferred submittal items,an additional plan review fee shall be charged <br /> at the above rate. <br /> • Expiration of plan review. Applications for which no permit is issued within 180 days following <br /> the date of application shall expire by limitation,and plans and other data submitted for review <br /> may thereafter be returned to the applicant or destroyed by the building official. The building <br /> official may extend the time for action by the applicant for a period not exceeding 180 days on <br /> request by the applicant showing that circum-stances beyond the control of the applicant have <br /> prevented action from being taken. No application shall be extended more than once. In order to <br /> renew action on an application after expiration,the applicant shall resubmit plans and pay a new <br /> plan review fee. <br /> Refund Fee <br /> • The building official may authorize refunding of any fee paid hereunder that was erroneously paid <br /> or collected. <br /> • The building official may authorize refunding of not more than eighty percent(80%)of the permit <br /> fee paid when no work has been done under a permit issued in accordance with this code. <br /> 2011 City Fee Schedule(Amended 6.27.2011) Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.