Laserfiche WebLink
CITY OF HUGO <br /> 2011 FEES,RATES AND CHARGES <br /> ESCROW <br /> FEES AND OTHER <br /> PLANNING B ZONING RELATED(continued): <br /> PROPERTY LINE RELATED: <br /> Encroachment Agreements $ 120.00 <br /> Property Line Adjustment Application $ 150.00 <br /> REZONING RELATED: <br /> Rezoning Application(less than 5 acres) $ 540.00 $ 1,000.00 <br /> Rezoning Application(more than 5 acres) $ 1,080.00 $ 1,000.00 <br /> Rezoning to Long-Term Agricultural $ 135.00 <br /> SITE PLAN RELATED: <br /> Commercial or Industrial Site Plan $ 350,00 $ 5,000.00 <br /> Farm Site Plan $ 30.00 <br /> Sketch Plan Review $ 110.00 <br /> STREET&ROADWAY RELATED: <br /> Street and Easement Vacation $ 110.00 $ 1,000.00 <br /> SUBDIVISION RELATED: Payable with Preliminary AND Final Plat Applications <br /> Minor Subdivision-Rural(3 lots or less) $ 220.00 $ 1,000.00 <br /> ♦ Minor Subdivision-Urban(3 lots or less) $ 220.00 $ 2,000.00 <br /> Subdivision-4 to 15 lots $ 540.00 $ 5,000.00 <br /> Subdivision-16 to 30 lots $ 700.00 $ 10,000.00 <br /> Subdivision-Over 30 lots $23 per lot $ 20,000.00 <br /> VARIANCE RELATED: <br /> Variance to Zoning Ordinance $ 200.00 <br /> _�..�,a. .#�.fit,'ws.x �...�. .uG. .:;,.+'S, •"ri:.s ...,«�x,.�' . xrler�: :� r�ay.""r'�3'w . .xcrs ?,?,�°._a.,ws��tk....»� .i.�.L..e '" <br /> PUBLICATIONS: <br /> Audit $ 55.00 <br /> Comprehensive Plan $ 55.00 <br /> Municipal Code $ 125.00 <br /> Zoning Map $ 7.00 <br /> Zoning Ordinance $ 65.00 <br /> Other Publications Cost+10% <br /> DVD Recordings $ 10.00 Official Newspaper Exempt <br /> PUBLIC WORKS RELATED: <br /> Grass/Weed Mowing $ 75.00 first half hour(minimum charge) <br /> Grass/Weed Mowing $ 50.00 each additional hour or fraction thereof <br /> Street Sweeping $ 150.00 per hour <br /> ROADWAY RECONSTRUCTION/REHAB: <br /> Single-Family Residential/Duplex Rates: <br /> Complete Reconstruction $ 5,200.00 per unit <br /> Partial Reconstruction $ 4,100.00 per unit <br /> Roadway Redamation/Overlay $ 3,400.00 per unit <br /> Urban Roadway Overlay $ 2,100.00 per unit <br /> Rural Roadway Overlay $ 1,800.00 per unit <br /> UTILITY RELATED: <br /> Hydrant Water(per truck load) $ 20.00 <br /> Hydrant Meter Rental Deposit $ 700.00 <br /> Hydrant Meter Rental $ 20.00 per day+$2.20/thousand gallons <br /> Sewer Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit <br /> Sewer Infrastructure Trunk Fee $ 1,632.00 per SAC unit r'1'1 0 <br /> Sewer Infrastructure(SAC)Fee $ 588.00 per SAC unit, <br /> Sewer Utility Permit $ 30.00 o co <br /> Water Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit m V <br /> Water Infrastructure Trunk Fee $ 1,960.00 per SACunit '1,��D G <br /> Water Infrastructure(WAC)Fee $ 680.00 per SAC unit OC <br /> Water Meter Rental-Residential $ 285.00 <br /> Water Meter Rental-Commercial-1&1/2"Meter $ 575.00 T Vr <br /> Water Meter Rental-Commercial-2"Meter $ 695.00 <br /> Water Meter Rental-Commercial-Larger than 2" Cost+10% <br /> Water Meter Rental-Irrigation-1&1l2"Meter $ 575.00 +2 WACs <br /> Water Meter Rental-Irrigation-2"Meter $ 695.00 +2 WACs <br /> Water Meter Rental-Irrigation-Larger than 2" Cost+10% +WACs to be determined by City Engineer <br /> Water Meter Testing $ 80.00 Refundable if meter is faulty <br /> Water Meter No-Access Penalty $ 75.00 <br /> Water Utility Permit $ 30.00 <br /> Page 3 <br />