My WebLink
|
Help
|
About
|
Sign Out
Home
2012.03.12 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2012 EDA Packets
>
2012.03.12 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2017 12:45:28 PM
Creation date
9/7/2017 12:45:28 PM
Metadata
Fields
Template:
Commissions
Meeting Date
3/12/2012
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wants to build, but everyone is looking for existing space. Graff stated that the EDA and <br /> the City are looking for a restaurant in Hugo. He stated that we need someone that has a <br /> successful business and wants something long term. Senior housing will not bring the <br /> restaurant to downtown Hugo. <br /> Commissioner Denaway stated that he would support a smaller housing component and a <br /> mix of commercial uses,not a senior housing project that would take up the entire site. <br /> He stated do not give up on commercial retail and marketing should mention the other <br /> options. <br /> Miron thanked the development team for presenting to the EDA. <br /> The EDA agreed that the development team should continue to work on development <br /> concepts for the property and they expect the purchase agreement to be extended in June. <br /> DISCUSSION ON INTERSECTION IMPROVEMENTS AT TH61 AND 170TH <br /> STREET <br /> MnDOT has plans to construct intersection improvements at TH61 and 170th Street <br /> (CSAH 8). The discussions include the options of a traffic signal or a roundabout. The <br /> construction will begin in 2013. If a roundabout is selected there will be a center island <br /> that can be improved. MnDOT has a basic landscape model for center islands, but other <br /> designs can be approved by MnDOT. Jay Kennedy, City Engineer,presented options to <br /> the EDA on possible designs for the center island and the projected costs of each design. <br /> Staff recommended that the EDA discuss the center island designs options and make a <br /> recommendation to the City Council. <br /> Klein made a motion, seconded by Denaway, to recommend to the City Council to <br /> authorize preparation of concepts/associated costs for consideration. <br /> All aye. Motion Carried. <br /> UPDATE ON MINNESOTA STABLE OWNERS ASSOCIATION <br /> Commissioner Graff addressed the EDA with an update on the Minnesota Stable Owners <br /> Association meeting he attended last week. He also discussed the possibility for future <br /> equestrian events in Hugo, such as a barn tour event. <br /> Commissioner Graff stated that he attended a stable association meeting that included six <br /> stables in Hugo. He stated that the stable association liked the idea of a barn tour event <br /> and would like to reach out to other stables in the area. There have been no dates set,but <br /> Commission Graff will keep the EDA updated. <br /> UPDATE ON FIBER OPTICS INSTALLED IN TH61 <br /> During the summer of 2011, fiber lines were installed along TH61. Staff met with <br /> Enventis the company that installed the fiber line through Hugo. The fiber line is <br /> available at a lease rate to anyone who would like to connect to the line. The line can <br />
The URL can be used to link to this page
Your browser does not support the video tag.