My WebLink
|
Help
|
About
|
Sign Out
Home
2012.04.09 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2012 EDA Packets
>
2012.04.09 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2017 12:49:06 PM
Creation date
9/7/2017 12:49:06 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/6/2012
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. <br /> O NNESN q2 =�� <br /> lOi TPPN <br /> Lnesota Department ofTransportation(MnDOT)is announcing a <br /> formation meeting to discuss the 135W North Managed LanesStudy.The project corridor includes 1-35W North from downtownolis to Forest Lake. The study will evaluate managed lane concepts <br /> s improvement strategies at spot locations along the I-35W <br /> rridor.This study is intended to identify the preferred managed <br /> cept and improvement strategies for the corridor and how <br /> ments could be strategically implemented over time. <br /> ft <br /> Date: Wednesday, May 2, 2012 For more information please visit: <br /> www.dot.state.mn.us/metro/projects/i3Swstudy <br /> Time: 5:00 t0 7:00 p.m. (Presentation at 5:30 p.m.) Bill Goff <br /> Minnesota Department of Transportation <br /> Metro Division—Waters Edge <br /> Location: Blame City Hall - Cloverleaf Farm Room 1500 West County Road B-2 <br /> Roseville,MN 44113 <br /> 651.234.7797 <br /> (10801 Town Square Drive NE, Blaine, MN 55449) Willam.goff@state.mn.us <br /> The purpose of the public open house is to provide project information about the overall Todd Polum <br /> scope and schedule of the study, explain managed lanes options, present alternative SRFConsultingGroup,Inc. <br /> screening criteria,and obtain input on the project alternatives.The public is encouraged One Carlson Parkway,Suite 150 <br /> Plymouth,MN 55447 <br /> to attend the meeting, provide input, and ask questions concerning this study. A brief 763.475.0010 <br /> presentation is planned for 5:30 p.m.MnDOT representatives will be available to answer tpolum@srfconsulting.com <br /> questions and discuss the study on an individual basis. <br /> . i. <br /> rid i <br /> &1:67 <br /> �.A —t <br /> _ 10 <br /> w.> <br /> �r <br /> 7.' -- <br /> C.' Ile 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.