My WebLink
|
Help
|
About
|
Sign Out
Home
2012.10.08 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2012 EDA Packets
>
2012.10.08 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2017 12:57:34 PM
Creation date
9/7/2017 12:57:33 PM
Metadata
Fields
Template:
Commissions
Meeting Date
10/8/2012
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ak <br /> WSB <br /> - Infrastructure■Engineering■Planning■Construction 701 Xenia Avenue South <br /> &Associates,Inc. 9 9 9 <br /> Suite 300 <br /> Minneapolis,MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> September 12, 2012 <br /> Ms. Liz Hanson <br /> Community Development Intern <br /> City of Hugo <br /> 14669 Fitzgerald Avenue North <br /> Hugo, MN 55038 <br /> Re: Sketch Plan Review—LaValle Property <br /> WSB Project No. 1904-00 <br /> Dear Ms. Hanson: <br /> We completed a preliminary review of the sketch plan for the proposed residential development of the <br /> LaValle property located adjacent to Lions Park. We reviewed the sketch plan prepared by Brunton <br /> Architects, no date provided. <br /> A summary of our findings is provided as follows: <br /> Roadways <br /> 1. The City's Comprehensive Transportation Plan includes the extension of 147t' Street within the <br /> northerly portion of the site, eventually connecting to Oneka Parkway to the west. The exact <br /> alignment, design, and timing will require further discussion as the project moves forward. <br /> 2. The plans include the removal of Finale Avenue between Upper 146th Street and 147t' Street, <br /> creating one contiguous site with Lions Park. The plans also include access to the proposed <br /> development via 146th Street and Finale Avenue rather than 147[1' Street. The roadway and access <br /> issues will need to be reviewed in greater detail in light of the planning process for Lions Park, as <br /> well as the anticipated traffic demand from the proposed site. <br /> Utilities <br /> 1. City sewer service is available to the site via an existing trunk sewer main located along the <br /> southern edge of the property. A sewer main or service line can be extended from the existing <br /> trunk sewer to serve the proposed development, as well as any needs within Lions Park. <br /> 2. City water service is available adjacent to the site. A watermain will need to be connected near <br /> Well #3 and extended to/through the site, connecting to the existing watermain at the Finale <br /> Ave/Upper 146th Street intersection. The watermain size will need to be determined based on <br /> anticipated demand, and can serve both the proposed development and Lions Park. <br /> 3. Trunk water and sewer charges will apply at the time of development. <br /> K:1904-064JR-,sinunm-060310.do, <br />
The URL can be used to link to this page
Your browser does not support the video tag.