Laserfiche WebLink
V. Environmental Site Assessment <br /> American Society of Testing (ASTM) information is available online at <br /> http://www.astm.org/Standard/index.shtml. Registered engineers must use the ASTM <br /> El 527 - 05 Standard Practice for Environmental Site Assessments: Phase I <br /> Environmental Site Assessment Process to complete the initial environmental <br /> assessment. <br /> Example Documents for Section IV <br /> Phase I Environmental Site Assessment <br /> Phase II Environmental Site Assessment <br /> Geotechnical Soil Tests <br /> VI. Transportation <br /> Rail and port access are not required, but sites with access will be more attractive to <br /> certain industries. <br /> Example Documents for Section VI <br /> Rail Survey <br /> Street Map <br /> Aerial Photo <br /> Community Profile <br /> VII. Utility Services <br /> • Definition of Terms <br /> • kV: kilovolts <br /> • kW: kilowatts <br /> • MCF: million cubic feet <br /> • PSI: pounds per square feet <br /> • GPM: gallons per minute <br /> • CFS: cubic feet per minute <br /> • GPD: gallons per day <br /> • Mbps: megabits per second <br /> • Not all utility services have to be at the site in order to submit an application. <br /> However, a determination of current proximity to the site along with the technical <br />