Laserfiche WebLink
LEED-ND PROJECT PROJECT LEED-ND SOURCE <br /> TOPIC DOES THE PROJECT DO THE FOLLOWING? YES MAYBE NO POINTS "YES" "MAYBE" CREDIT OR <br /> POSSIBLE POINTS POINTS PREREQUISITE <br /> Generates renewable energy on-site,providing the following percentage of the Credit 11.On-Site <br /> project's annual electrical thermal and energy cost(pick just one for scoring). Renewable Energy <br /> 5% ❑ ❑ ❑ 1 Sources <br /> ENERGY 12.5% ❑ ❑ ❑ 2 <br /> PRODUCTION 2C% ❑ ❑ ❑ 3 <br /> AND <br /> DISTRIBUTION Provides at least 80%of building heating and cooling through a shared Credit 12:District <br /> neighborhood-wide system. d ❑ ❑ 2 Heating/Cooling <br /> i <br /> Provides energy-efficient new neighborhood infrastructure such as traffic lights, Credit 13: <br /> street lights,and water and wastewater pumps(15%minimum improvement over a ❑ ❑ ❑ 1 Infrastructure <br /> conventional model). Energy Efficiency <br /> Meets minimum requirements for water efficiency in buildings(at least 20% Prereq 3:Minimum <br /> reduction over a baseline-see Rating System for details). ❑ ❑ ❑ Required Building Water <br /> WATER Efficiency <br /> EFFICIENCY Exceeds increased threshold for water efficiency in buildings tat least 40%reduction Credit 3:Building <br /> LI <br /> o AND over baseline--see Rating System for details). ❑ ❑ 1 <br /> — Water Efficiency <br /> CONSERVATION 4: <br /> Credit Cr <br /> Reduces water consumption for outdoor landscaping(at least 50%reduction over ❑ ❑ ❑ 1 Water-Efficient <br /> 4:ficient <br /> baseline). Landscaping <br /> Is able to retain and treat all stormwater on-site from the following sizes of Credit 8.Stormwater <br /> rainstorm(pick just one for scoring): Management <br /> 8011,percentile rainstorm(more rain than 80%of storms for the past ❑ ❑ ❑ 1 <br /> 20.40 years) <br /> 85th percentile rainstorm ❑ ❑ ❑ 2 <br /> STORMWATER <br /> AND 90",percentile rainstorm ❑ ❑ ❑ 3 <br /> WASTEWATER 9511,percentile rainstorm ❑ ❑ I ❑ 4 <br /> Credit 14: <br /> Treats and reuses wastewater on-site(pick just one of the following for scoring): Wastewater <br /> Management25%of wastewater reused ❑ ❑ ❑ 1 <br /> 50%of wastewater reused I D ❑ ❑ 2 <br /> This document has been reprinted with permission from the Natural Resources Defense Council. The full document(A Citizen's Guide to <br /> LEED for Neighborhood Development)can be found at.htt://www.nrdc.org/cities/Smartcgrowth/legd.asp <br />