Laserfiche WebLink
installation or reconstruction of storm sewer, and storm water management <br /> improvements. <br /> 2. Partial Roadway Reconstruction: This classification is intended to be used for <br /> existing urban-section roadways. The improvements shall include complete <br /> pavement removal, subgrade correction as needed, new sidewalks,partial <br /> repair/replacement of concrete curb and gutter and sidewalks/trails, storm sewer <br /> repair, and storm water management improvements. <br /> 3. Roadway Reclamation/Overlay: This classification is intended to be used for existing <br /> rural-section roadways that will remain as a rural section following the project. The <br /> project will include recycling the existing pavement as aggregate base, minor <br /> subgrade corrections as necessary,minor grading, minor storm sewer and drainage <br /> improvements, and storm water management improvements. <br /> 4. Urban Roadway Mill and Overlay: This will include milling of pavement on the <br /> outside edges,partial repair/replacement of concrete curb and gutter and <br /> sidewalks/trails, and resurfacing of the roadway. <br /> 5. Rural Roadway Overlay: This will include a resurfacing of the roadway including <br /> placement of gravel shouldering. <br /> 6. Routine Roadway Maintenance: This shall include roadway patching/spot overlays, <br /> seal coating, and crack filling. No costs associated with routine roadway maintenance <br /> shall be assessed. <br /> E. Private Street Improvements <br /> 1. Unless otherwise specified by the City, the developer or owners of lands adjoining <br /> private streets shall undertake and pay for improvements to private streets and <br /> appurtenances according to the City specifications. <br /> F. Sanitary Sewer and Water Main Laterals <br /> 1. For improvements to existing sanitary sewer and watermain laterals, no assessments <br /> shall be levied. City funding will include a combination of utility funds and/or grant <br /> monies. <br /> 2. For new developments and projects petitioned by benefiting properties currently not <br /> serviced by sanitary sewer and/or water mains, and projects not included in the <br /> Capital Improvements Plan, one hundred percent(100%) of the project costs for <br /> sanitary sewer and water utilities shall be assessed to all parcels within the <br /> development. <br /> Page 3 <br />