My WebLink
|
Help
|
About
|
Sign Out
Home
2005.07.18 EDA Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2005 EDA Packets
>
2005.07.18 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 11:03:19 AM
Creation date
9/14/2017 11:03:19 AM
Metadata
Fields
Template:
Commissions
Meeting Date
7/18/2005
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
175.01Jafvert <br /> I I 1 mueller <br /> — architects <br /> C) inc. <br /> p M 50-i u] <br /> ( � I aoe.+.pon MNlUn <br /> y •».m.vuacr-woi <br /> _ BUILDING SETBACK <br /> DRIVE—IN I UNDERGROUND <br /> DOOR TOOLS,INC. <br /> I I <br /> z <br /> o U PROPOSED BUILDING <br /> HUGO,MN <br /> 9,135 SF I <br /> WAREHOUSE <br /> 52.00 M <br /> 40.00 40.00 N <br /> 10,712 SF r I <br /> TOTAL < <br /> BUILDING <br /> o C-) o PRELIMINARY <br /> eO 0- NOT FOR CONSTRUCTION <br /> N to <br /> O <br /> revisions: <br /> 11,577 SF\\\\\\l date: description <br /> OFFICEe JUL 05 <br /> ;„: ao, <br /> neoea r r p.M:q <br /> / 9 JUL OS spaces d MVMs.E <br /> Oui"s¢e <br /> I / <br /> Area Calculations: <br /> Site 43,177 SF 5' PARKING SETBACK-TYP SCHEMATIC <br /> Max 80%hardsurface coverage 34,541 SF / ENTIRE PARCEL DESIGN <br /> Actual coverage I <br /> Building 10,712 SF / date: 7 JULY 05 <br /> Hardsurface 20,248 SF drawn by: MRH <br /> Total 30.960 SF checked: <br /> cont.no.: 205189 <br /> sheet number. <br /> _SCHEMATIC SITE DESIGN S D 1 <br /> D1 t•.p• <br /> NORTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.