My WebLink
|
Help
|
About
|
Sign Out
Home
2018.01.08 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.01.08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:38:25 PM
Creation date
1/4/2018 4:18:34 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
1/8/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At <br />'SB <br />Principal <br />2018 Rate Schedule <br />Associate / Sr. Project Manager / Sr. Project Engineer <br />d Project Manager <br />Project Engineer <br />Graduate Engineer <br />Sr. Landscape Architect / Sr. Planner / Sr. GIS Specialist <br />Landscape Architect / Planner / GIS Specialist <br />Engineering Specialist / Sr. Environmental Scientist <br />Engineering Technician / Environmental Scientist <br />Construction Observer <br />Pavement Coring <br />Survey <br />One -Person Crew <br />Two -Person Crew <br />One -Person Crew <br />Two -Person Crew <br />Three -Person Crew <br />Office Technician <br />Billing Rate/Hour <br />$163-$182 <br />$147-$182 <br />$128-$142 <br />$112-$142 <br />$85-$105 <br />$115-$142 <br />$68-$107 <br />$97-$139 <br />$56-$92 <br />$92-$116 <br />$170 <br />$255 <br />$140 <br />$185 <br />$198 <br />$50-$90 <br />Costs associated with word processing, cell phones, reproduction of common correspondence, and mailing are <br />included in the above hourly rates. Vehicle mileage is included in our billing rates [excluding geotechnical and <br />construction materials testing (CMT) service rates]. Mileage can be charged separately, if specifically outlined <br />by contract. <br />Reimbursable expenses include costs associated with plan, specification, and report reproduction; permit fees; <br />delivery costs; etc. <br />Multiple rates illustrate the varying levels of experience within each category <br />Rate Schedule is adjusted annually. <br />Building a legacy -- your legacy. <br />Equal Opportunity Employer � wsbeng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.