My WebLink
|
Help
|
About
|
Sign Out
Home
2018.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:50:52 PM
Creation date
2/1/2018 2:52:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preventative Maintenance <br />Longterm preventative programs and measures for the City's existing <br />water system will help reduce the risk of emergency situations. The <br />City of Hugo staff has a number of programs to help reduce these <br />risks. <br />The well pumps are critical to the system's supply and do wear out <br />with time due to their extensive use. Public Works Operations staff <br />checks pump oil, bearings, and packing each weekday. Staff changes <br />the pump oil in the spring and fall of each year. Well pumps are <br />annually inspected by a well contractor to ensure proper operation. <br />Annual well functions inspected include voltage, flow rate, vibration, <br />water level, and other maintenance issues. In addition, pumps are <br />pulled and serviced, rebuilt, or replaced as necessary every seven <br />years. <br />The water distribution system components are inspected and replaced <br />when appropriate as part of the City's annual street reconstruction <br />projects. Fire hydrants are flushed twice a year and gate valves are <br />periodically exercised to confirm they are in proper working order and <br />to identify issues within the distribution system. Storage facilities are <br />cleaned and inspected every five years and repainted as necessary. <br />)GO 2040 COMPREHENSIVE PLAN UPDATE <br />DRAFT Dec14-17 <br />for review only <br />91 <br />COMPREHENSIVE WATER SUPPLY 214 <br />AND DISTRIBUITION PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.