My WebLink
|
Help
|
About
|
Sign Out
Home
2018.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:50:52 PM
Creation date
2/1/2018 2:52:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Funding <br />Funding for the project will be provided through assessments to benefiting properties, City Street Funds, <br />and the City's Municipal State Aid Funds. Grant funding, if available, will be pursued for the project <br />during final design. The proposed funding is outlined as follows: <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />Street Reclamation at Existing Widths — Funding <br />Assessments <br />CIP/State Aid Funds <br />Total Funding <br />Street Improvements <br />$166,000 <br />$908,000 <br />$1,074,000 <br />Drainage Improvements <br />$0 <br />$106,000 <br />$106,000 <br />TOTAL <br />$166,000 <br />$1,014,000 <br />$1,180,000 <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />Alternate 1: Street Reclamation and Widening — Funding <br />Assessments <br />CIP/State Aid Funds <br />Total Funding <br />Street Improvements <br />$166,000 <br />$1,018,000 <br />$1,184,000 <br />Drainage Improvements <br />$0 <br />$106,000 <br />$106,000 <br />TOTAL <br />$166,000 <br />$1,124,000 <br />$1,290,000 <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />Alternate 2: Utility Extension — Funding <br />Assessments <br />City Utility Fund <br />Total Funding <br />Watermain Improvements <br />$122,000 <br />$18,000 <br />$140,000 <br />Sanitary Improvements <br />$154,000 <br />$0 <br />$154,000 <br />TOTAL <br />$276,000 <br />$18,000 <br />$294,000 <br />5.3 Preliminary Assessment Roll <br />Assessments will be levied to the benefiting properties as outlined in Minnesota Statute 429 and the <br />City's Assessment Policy. A detailed preliminary assessment roll is included in Appendix C. The <br />assessment rate for roadway reclamation projects is as follows: <br />■ Rural Roadway Reclamation <br />$3,400/unit <br />Properties with footage adjacent to two roadways, will be assessed only for 1/2 of a unit per street. If only <br />one of the roadways adjacent to a property is being reclaimed, the total assessment will be only 1/2 of a <br />unit at this time. Similarly, properties with footage adjacent to three roadways, will be assessed 1/3 of a <br />unit per street. If only one street is being reclaimed, the total assessment will be only 1/3 of a unit. <br />The watermain and sanitary sewer costs will be fully assessed to the benefiting property owners for the <br />proposed utility lines that serve their property. The City will fund the cost to upsize the watermain from <br />the 8 -inch required to serve the adjacent development to a larger 12 -inch trunk main which will provide <br />adequate service for further extension and supply. <br />Feasibility Report <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />City of Hugo, MN <br />WSB Project No. R-010893-000 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.