Laserfiche WebLink
K:\010893-000\Quantity\Preliminary\010893-000_OPC_LM E_020518 <br />Opinion of Probable Cost <br />WSB Project: <br />Project Location: <br />WSB Project No: <br />Oneka Lake Blvd & Harrow Avenue Improvement Project <br />City of Hugo <br />10893-000 <br />Design By: <br />Checked By: <br />Date: <br />LME <br />JLS <br />2/5/2018 <br />Item No. <br />MN/DOT <br />Specification No. <br />Description <br />Unit <br />Estimated <br />Total Quantity <br />Estimated Unit <br />Price <br />Estimated Total Cost <br />SCHEDULE B - DRAINAGE IMPROVEMENTS <br />43 <br />2104.501 <br />2105.607 <br />2501.511 <br />2501.511 <br />2501.602 <br />2511.501 <br />2563.610 <br />REMOVE SEWER PIPE (STORM) <br />1 1/2" CLEAR ROCK <br />12" PIPE CULVERT <br />18" PIPE CULVERT <br />18" CS PIPE APRON <br />RANDOM RIPRAP CLASS III (CV) <br />UTILITY CREW <br />LIN FT <br />352 <br />$7.00 <br />$2,464.00 <br />44 <br />CU YD <br />200 <br />$55.00 <br />$70.00 <br />$70.001 <br />$450.001 <br />$120.001 <br />$700.001 <br />$11,000.00 <br />$16,170.00 <br />$24,640.00 <br />$7,200.00 <br />$8,280.00 <br />$7,000.00 <br />45 <br />LIN FT <br />231 <br />46 <br />LIN FT <br />352 <br />47 <br />EACH <br />CU YD <br />16 <br />69 <br />10 <br />48 <br />49 <br />HOUR <br />TOTAL <br />CONTINGENCY TOTAL (10%) <br />SUBTOTAL TOTAL <br />INDIRECT COST TOTAL (25%) <br />TOTAL <br />$76,754.00 <br />$7,675.40 <br />$84,429.40 <br />$21,107.35 <br />$106,000.00 <br />GRAND TOTAL: <br />$1,180,000.00 <br />K:\010893-000\Quantity\Preliminary\010893-000_OPC_LM E_020518 <br />