My WebLink
|
Help
|
About
|
Sign Out
Home
2018.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:50:52 PM
Creation date
2/1/2018 2:52:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />540 Gateway Boulevard I Suite 100 1 Burnsville, MN 55337 1 (952) 737-4660 <br />February 1, 2018 <br />Mr. Scott Anderson <br />Public Works Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Geotechnical Report <br />Oneka Lake Boulevard and Harrow Avenue Improvements <br />Hugo, Minnesota <br />WSB Project No.: 010893-000 <br />We have conducted a geotechnical subsurface exploration program for the above referenced project. <br />This report contains our soil boring logs, an evaluation of the conditions encountered in the borings and <br />our recommendations for utility installation and pavement design. <br />If you have any questions concerning this report or our recommendations, or for construction material <br />testing for this project, please call us at (952) 737-4660. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Osborn, PE Darin Hyatt, PE <br />Geotechnical Project Engineer Senior Geotechnical Engineer <br />Attachment <br />MWO/tw <br />Building a legacy —your legacy. <br />Equal Opportunity Employer I wsbeng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.