Laserfiche WebLink
THE INSTALLED CHAMBER SYSTEM SHALL PROVIDE <br />THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD <br />BRIDGE DESIGN SPECIFICATIONS SECTION 12.12 FOR <br />EARTH AND LIVE LOADS, WITH CONSIDERATION FOR <br />IMPACT AND MULTIPLE VEHICLE PRESENCES. <br />SC -740 CHAMBER <br />%-2INCH WASHED, <br />CRUSHED, ANGULAR STONE <br />ADS 601 GEOTEXTILE OR EQUAL <br />PAVEMENT <br />ELEVATIONS VARY. <br />t <br />SEE PLANS. <br />EL 931.3 <br />EL=930.8 <br />EL=928.3' <br />EL=927.8' <br />PIPE CONNECTION TO <br />BOTTOM OF END CAPS. <br />CHAMBERS SHALL MEET ASTM F 2418-05 "STANDARD <br />SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED <br />WALL STORMWATER COLLECTION CHAMBERS". <br />GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES, <br /><35% FINES. COMPACT IN 6 IN LIFTS TO 95% PROCTOR DENSITY. <br />SEE THE TABLE OF ACCEPTABLE FILL MATERIALS. <br />SC -740 END CAP <br />PAVEMENT ---\ <br />1 1 <br />V <br />:.i•.. <br />•¢ 'FbR UNPAVED IIV TALLATION WHERE `•ti°:^.'.� :< <br />n n <br />`•• RUTTING FROM VEHICLES MAY OCCUR; : <br />.�%h":-y::a';'INCREASE COVER T0241NCHES :::.:-.,- : MAX.MIN. <br />30" <br />ON <br />6" �I � 51 12" MIN. TYP. <br />MIN. <br />THIS CROSS SECTION DETAILS THE REQUIREMENTS <br />NECESSARY TO SATISFY THE LOAD FACTORS SPECIFIED <br />IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS <br />FOR STORMTECH INFORMATION SECTION 12.12 FOR EARTH AND LIVE LOADS USING <br />CALL 1-888-892-2694 STORMTECH CHAMBERS `SEE STORMTECH DESIGN MANUAL <br />so SC -740 TYPICAL CROSS SECTION <br />ACCEPTABLE FILL MATERIALS <br />STORMTECH SC -310 AND SC -740 CHAMBER SYSTEMS <br />MATERIAL LOCATION <br />DESCRIPTION <br />AASHTO M43 <br />AASHTO M145 <br />COMPACTION/DENSITY <br />INSPECTION PORT WITH SCREW-IN CAP <br />PAVEMENT <br />DESIGNATION <br />DESIGNATION <br />REQUIREMENT <br />@ FILL MATERIAL FROM 18" <br />ANY SOIL/ROCK MATERIALS, NATIVE <br />N/A <br />N/A <br />PREPARE PER ENGINEER'S PLANS. PAVED <br />TO GRADE ABOVE CHAMBERS <br />SOILS OR PER ENGINEER'S PLANS. <br />OUR TECHNICAL SERVICES DEPARTMENT OFFERS <br />7. <br />INSTALLATIONS MAY HAVE STRINGENT MATERIAL <br />SC740EPE12B <br />CHECK PLANS FOR PAVEMENT <br />12 in (300 mm) <br />REQUIREMENTS AS INDICATED IN THE MOST CURRENT VERSION <br />AND PREPARATION REQUIREMENTS. <br />CONTACT OUR TECHNICAL SERVICES REPRESENTATIVE AT <br />SUBGRADE REQUIREMENTS. <br />OF STORMTECH'S INSTALLATION INSTRUCTIONS. <br />18.40 in (467 Tim) 10.36 in (263 mm) 9.00 in (229 mm) <br />LEAST 30 DAYS PRIOR TO SYSTEM INSTALLATION TO ARRANGE <br />© FILL MATERIAL FOR 6" TO 18" <br />GRANULAR WELL -GRADED <br />3, 357, 4, 467, <br />A-1 <br />COMPACT IN 6" LIFTS TO A MINIMUM 95% <br />ELEVATION ABOVE CHAMBERS <br />SOIL/AGGREGATE MIXTURES, <br />5, 56, 57, 6, <br />A-2 <br />STANDARD PROCTOR DENSITY. ROLLER GROSS <br />(24" FOR UNPAVED INSTALLATIONS) <br />-35% FINES. <br />67, 68, 7, 78, <br />A-3 <br />VEHICLE WEIGHT NOT TO EXCEED 12,000 LBS. <br />INSTALLING CONTRACTOR OF THE MINIMUM INSTALLATION <br />24 in (600 mm) <br />8, 89, 9, 10 <br />0.10 in (3 mm) <br />DYNAMIC FORCE NOT TO EXCEED 20,000 LBS. <br />© EMBEDMENT STONE SURROUNDING <br />WASHED ANGULAR STONE WITH THE <br />3, 357, 4, 467, 5, <br />N/A <br />NO COMPACTION REQUIRED <br />AND TO A 6" ELEVATION ABOVE <br />MAJORITY OF PARTICLES BETWEEN <br />56,57 <br />THE END CAP SHALL BE DESIGNED TO FIT INTO ANY <br />ACROSS OR PARKING OVER THE STORMWATER SYSTEM. <br />CHAMBERS <br />%-2INCH <br />TEMPORARY FENCING, WARNING TAPE AND APPROPRIATELY <br />QA FOUNDATION STONE BELOW <br />WASHED ANGULAR STONE WITH THE <br />3, 357, 4, 467, <br />N/A <br />PLATE COMPACT OR ROLL TO ACHIEVE A <br />CHAMBERS <br />MAJORITY OF PARTICLES BETWEEN <br />5, 56, 57 <br />STORMTECH'S REQUIREMENTS FOR SYSTEMS WITH PAVEMENT <br />95% STANDARD PROCTOR DENSITY <br />CONSTRUCTION AREAS. <br />3/4 - 2 INCH <br />DESIGN (ASPHALT, CONCRETE PAVERS, ETC.): MINIMUM COVER <br />VARIOUS LENGTHS. <br />PLEASE NOTE: THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE WASHED <br />CRUSHED ANGULAR. FOR EXAMPLE, THE STONE MUST BE SPECIFIED AS WASHED, CRUSHED, ANGULAR NO. 4 STONE. <br />AASHTO M288 CLASS 2 <br />NON -WOVEN GEOTEXTILE <br />ALL AROUND ANGULAR STONE <br />3o STORMTECH ACCEPTABLE FILL MATERIALS <br />T <br />18 <br />96 <br />4" PVC RISER <br />MIN MAX. <br />, , , , , INSPECTION PORT TO BE <br />SC -740 CHAMBER <br />ATTACHED THROUGH <br />KNOCK -OUT LOCATED <br />AT CENTER OF CHAMBER <br />AASHTO M288 CLASS 2 <br />NON -WOVEN GEOTEXTILE FOR STORMTECH INFORMATION CALL 1-888-892-2694 <br />e STORMTECH INSPECTION PORT DETAIL <br />INSPECTION PORT <br />BY MANUFACTURER <br />SPECIFICATIONS <br />.ASS 1 WOVEN GEOTEXTILE OR EQUAL, <br />BETWEEN FOUNDATION STONE AND CHAMBERS <br />SC -740--5'-6' WIDE STRIP <br />SC -310--4' WIDE STRIP <br />COVER ENTIRE ROW WITH <br />AASHTO M288 CLASS 2 NON -WOVEN <br />GEOTEXTILE OR EQUAL <br />SC -740--8' WIDE STRIP <br />SC -310--5' WIDE STRIP <br />STORMTECH ENDCAP <br />FOR STORMTECH INFORMATION <br />CALL 1-888-892-2694 <br />12" HDP <br />IN <br />- ZMTECH CHAMBERS <br />PLACE MINIMUM 12.5' OF AASHTO M288 CLASS 1 <br />WOVEN GEOTEXTILE OVER BEDDING STONE FOR <br />SCOUR PROTECTION AT ALL CHAMBER INLET ROWS <br />PIPE CONNECTION TO <br />BOTTOM OF END CAPS. <br />BOTTOM OF CHA <br />ELEVATIOI' <br />BOTTOM OF - <br />STONE ELEV.= 927.9' <br />FOR STORMTECH INFORMATION <br />CALL 1-888-892-2694 <br />SECTION A -A <br />e STORMTECH ELEVATIONS <br />UK KUVV <br />'C740 <br />rKcrHesKlt H I ED END CAP <br />NOTES: <br />1. ALL DESIGN SPECIFICATIONS FOR STORMTECH CHAMBERS SHALL BE IN ACCORDANCE WITH THE <br />STORMTECH DESIGN MANUAL. <br />2. THE INSTALLATION OF STORMTECH CHAMBERS SHALL BE IN ACCORDANCE WITH THE LATEST STORMTECH <br />INSTALLATION INSTRUCTIONS. <br />3. THE CONTRACTOR IS ADVISED TO REVIEW AND UNDERSTAND THE INSTALLATION INSTRUCTIONS PRIOR <br />TO BEGINNING SYSTEM INSTALLATION. CALL 1-888-892-2694 OR VISIT WWW.STORMTECH.COM TO RECEIVE A <br />COPY OF THE LATEST STORMTECH INSTALLATION INSTRUCTIONS. <br />4. CHAMBERS SHALL MEET THE DESIGN REQUIREMENTS AND LOAD FACTORS SPECIFIED IN SECTION 12.12 OF <br />THE LATEST EDITION OF THE AASHTO LRFD BRIDGE DESIGN <br />SPECIFICATIONS LOADS SHALL BE CALCULATED IN ACCORDANCE WITH SECTION 3 AND SHALL INCLUDE H2O <br />DESIGN TRUCK, IMPACT FACTOR, MULTIPLE PRESENCE, AND LANE LOAD. <br />STORMTECH GENERAL NOTES <br />1. <br />FLOOR BOX FRAME AND LID W/S.S. <br />6. <br />CAP SCREW LID CLOSURE <br />D <br />INSPECTION PORT WITH SCREW-IN CAP <br />PAVEMENT <br />"C" CONCRETE <br />T17T71n mm n --7 7TM71n mm <br />`CLASS <br />AASHTO M288 CLASS 2 <br />SC740EPE06B <br />/ ` ON WO EN GEOTEXTILE <br />T <br />18 <br />96 <br />4" PVC RISER <br />MIN MAX. <br />, , , , , INSPECTION PORT TO BE <br />SC -740 CHAMBER <br />ATTACHED THROUGH <br />KNOCK -OUT LOCATED <br />AT CENTER OF CHAMBER <br />AASHTO M288 CLASS 2 <br />NON -WOVEN GEOTEXTILE FOR STORMTECH INFORMATION CALL 1-888-892-2694 <br />e STORMTECH INSPECTION PORT DETAIL <br />INSPECTION PORT <br />BY MANUFACTURER <br />SPECIFICATIONS <br />.ASS 1 WOVEN GEOTEXTILE OR EQUAL, <br />BETWEEN FOUNDATION STONE AND CHAMBERS <br />SC -740--5'-6' WIDE STRIP <br />SC -310--4' WIDE STRIP <br />COVER ENTIRE ROW WITH <br />AASHTO M288 CLASS 2 NON -WOVEN <br />GEOTEXTILE OR EQUAL <br />SC -740--8' WIDE STRIP <br />SC -310--5' WIDE STRIP <br />STORMTECH ENDCAP <br />FOR STORMTECH INFORMATION <br />CALL 1-888-892-2694 <br />12" HDP <br />IN <br />- ZMTECH CHAMBERS <br />PLACE MINIMUM 12.5' OF AASHTO M288 CLASS 1 <br />WOVEN GEOTEXTILE OVER BEDDING STONE FOR <br />SCOUR PROTECTION AT ALL CHAMBER INLET ROWS <br />PIPE CONNECTION TO <br />BOTTOM OF END CAPS. <br />BOTTOM OF CHA <br />ELEVATIOI' <br />BOTTOM OF - <br />STONE ELEV.= 927.9' <br />FOR STORMTECH INFORMATION <br />CALL 1-888-892-2694 <br />SECTION A -A <br />e STORMTECH ELEVATIONS <br />UK KUVV <br />'C740 <br />rKcrHesKlt H I ED END CAP <br />NOTES: <br />1. ALL DESIGN SPECIFICATIONS FOR STORMTECH CHAMBERS SHALL BE IN ACCORDANCE WITH THE <br />STORMTECH DESIGN MANUAL. <br />2. THE INSTALLATION OF STORMTECH CHAMBERS SHALL BE IN ACCORDANCE WITH THE LATEST STORMTECH <br />INSTALLATION INSTRUCTIONS. <br />3. THE CONTRACTOR IS ADVISED TO REVIEW AND UNDERSTAND THE INSTALLATION INSTRUCTIONS PRIOR <br />TO BEGINNING SYSTEM INSTALLATION. CALL 1-888-892-2694 OR VISIT WWW.STORMTECH.COM TO RECEIVE A <br />COPY OF THE LATEST STORMTECH INSTALLATION INSTRUCTIONS. <br />4. CHAMBERS SHALL MEET THE DESIGN REQUIREMENTS AND LOAD FACTORS SPECIFIED IN SECTION 12.12 OF <br />THE LATEST EDITION OF THE AASHTO LRFD BRIDGE DESIGN <br />SPECIFICATIONS LOADS SHALL BE CALCULATED IN ACCORDANCE WITH SECTION 3 AND SHALL INCLUDE H2O <br />DESIGN TRUCK, IMPACT FACTOR, MULTIPLE PRESENCE, AND LANE LOAD. <br />STORMTECH GENERAL NOTES <br />1. <br />STORMTECH LLC ("STORMTECH") REQUIRES INSTALLING <br />6. <br />STONE PLACEMENT BETWEEN CHAMBERS ROWS AND AROUND <br />D <br />CONTRACTORS TO USE AND UNDERSTAND STORMTECH'S <br />THAT THE OUTSIDE DIAMETER OF THE STUB IS <br />PERIMETER MUST FOLLOW INSTRUCTIONS AS INDICATED IN THE <br />T17T71n mm n --7 7TM71n mm <br />LATEST INSTALLATION INSTRUCTIONS PRIOR TO BEGINNING <br />SC740EPE06B <br />MOST CURRENT VERSION OF STORMTECH'S INSTALLATION <br />6 in (150 mm) <br />SYSTEM INSTALLATION. <br />0.50 in (13 mm) <br />INSTRUCTIONS. <br />2. <br />OUR TECHNICAL SERVICES DEPARTMENT OFFERS <br />7. <br />BACKFILLING OVER THE CHAMBERS MUST FOLLOW <br />SC740EPE12B <br />INSTALLATION CONSULTATIONS TO INSTALLING CONTRACTORS. <br />12 in (300 mm) <br />REQUIREMENTS AS INDICATED IN THE MOST CURRENT VERSION <br />1.20 in (30 mm) <br />CONTACT OUR TECHNICAL SERVICES REPRESENTATIVE AT <br />SC 740 <br />OF STORMTECH'S INSTALLATION INSTRUCTIONS. <br />18.40 in (467 Tim) 10.36 in (263 mm) 9.00 in (229 mm) <br />LEAST 30 DAYS PRIOR TO SYSTEM INSTALLATION TO ARRANGE <br />SC740EPE15B <br />SC 740 <br />15 in (375 mm) <br />A PRE -INSTALLATION CONSULTATION. OUR REPRESENTATIVES <br />8. <br />THE CONTRACTOR MUST REFER TO STORMTECH'S INSTALLATION <br />SC 740 <br />CAN THEN ANSWER QUESTIONS OR ADDRESS COMMENTS ON <br />N/A <br />INSTRUCTIONS FOR A TABLE OF ACCEPTABLE VEHICLE LOADS AT <br />SC 740 <br />THE STORMTECH CHAMBER SYSTEM AND INFORM THE <br />19.70 in (500 Tim) in (272 mm) N/A <br />VARIOUS DEPTHS OF COVER. THIS INFORMATION IS ALSO <br />SC740EPE24B <br />INSTALLING CONTRACTOR OF THE MINIMUM INSTALLATION <br />24 in (600 mm) <br />AVAILABLE AT STORMTECH'S WEBSITE: WWW.STORMTECH.COM. <br />0.10 in (3 mm) <br />REQUIREMENTS BEFORE BEGINNING THE SYSTEM'S <br />_ <br />n <br />� a <br />THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING VEHICLES <br />CONSTRUCTION. CALL 1-888-892-2694 TO SPEAK TO A <br />IQ <br />THAT EXCEED STORMTECH'S REQUIREMENTS FROM TRAVELING <br />uj <br />TECHNICAL SERVICE REPRESENTATIVE OR VISIT <br />THE END CAP SHALL BE DESIGNED TO FIT INTO ANY <br />ACROSS OR PARKING OVER THE STORMWATER SYSTEM. <br />N <br />WWW.STORMTECH.COM TO RECEIVE A COPY OF OUR <br />TEMPORARY FENCING, WARNING TAPE AND APPROPRIATELY <br />INSTALLATION INSTRUCTIONS. <br />co <br />j <br />LOCATED SIGNS ARE COMMONLY USED TO PREVENT <br />CAPPING A CHAMBER THAT HAS ITS LENGTH TRIMMED; <br />Ja0 <br />W (-)X <br />UNAUTHORIZED VEHICLES FROM ENTERING SENSITIVE <br />3. <br />STORMTECH'S REQUIREMENTS FOR SYSTEMS WITH PAVEMENT <br />CONSTRUCTION AREAS. <br />2.7 PENETRATING THE SIDEWALLS TO ALLOW FOR LATERAL <br />DESIGN (ASPHALT, CONCRETE PAVERS, ETC.): MINIMUM COVER <br />VARIOUS LENGTHS. <br />IS 18 INCHES NOT INCLUDING PAVEMENT; MAXIMUM COVER IS <br />9. <br />THE CONTRACTOR MUST APPLY EROSION AND SEDIMENT <br />aO <br />U <br />96 INCHES INCLUDING PAVEMENT. FOR INSTALLATIONS THAT <br />-� <br />CONTROL MEASURES TO PROTECT THE STORMWATER SYSTEM <br />Cl)Z <br />DO NOT INCLUDE PAVEMENT, WHERE RUTTING FROM VEHICLES <br />STORMTECH SC -740 SHALL BE 30.0 INCHES TALL, 51.0 <br />DURING ALL PHASES OF SITE CONSTRUCTION PER LOCAL CODES <br />Q Lu <br />MAY OCCUR, MINIMUM REQUIRED COVER IS 24 INCHES, <br />U <br />AND DESIGN ENGINEER'S SPECIFICATIONS. <br />ALLOW FOR EQUALIZATION OF AIR PRESSURE BETWEEN ITS <br />MAXIMUM COVER IS 96 INCHES. <br />BE USED TO INLET THE SYSTEM. <br />d - <br />0 o <br />O z <br />10. <br />STORMTECH PRODUCT WARRANTY IS LIMITED. SEE CURRENT <br />4. <br />THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH <br />u.. <br />PRODUCT WARRANTY FOR DETAILS. TO ACQUIRE A COPY CALL <br />THE END CAP SHALL HAVE EXCESS STRUCTURAL <br />CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO <br />ZV. It <br />STORMTECH AT 1-888-892-2694 OR VISIT WWW.STORMTECH.COM. <br />oN <br />THE DESIGN ENGINEER. <br />; W <br />CHAMBER SHALL BE 85.4 INCHES. <br />5. <br />AASHTO M288 CLASS 2 NON -WOVEN GEOTEXTILE (FILTER <br />SIZE AT ANY INVERT ELEVATION. <br />0- r <br />�� <br />FABRIC) MUST BE USED AS INDICATED IN THE PROJECT PLANS. <br />MANHOLE WITI- <br />OVERFLOW WE <br />ECCENTRIC <br />HEADER <br />PLACE MINIMUM 12.5' OF AASHTO M281 <br />CLASS 1 WOVEN GEOTEXTILE OVEF <br />BEDDING STONE FOR SCOUR PROTECTIOf <br />AT ALL CHAMBER INLET ROW: <br />STORMTE <br />PREFABRICA1 <br />7.0 END CF <br />STORMTE <br />ROW MAN <br />CH ISOLATOR TM <br />IFOLD DETAIL <br />STORMTECH <br />ISOLATOR ROW <br />:H CHAMBERS <br />CH INFORMATION <br />kLL1-888-892-2694 <br />ACCEPTS 4" SCH 40 PIPE <br />'ECTION PORT <br />301.0" <br />1 <br />51" <br />90.7" ACTUAL LENGTH <br />NOMINAL CHAMBER SPECIFICATIONS <br />SIZE (W x H x INSTALLED LENGTH) - <br />CHAMBER STORAGE - <br />MINIMUM INSTALLED STORAGE - <br />WEIGHT - <br />STUBS AT TOP OF END CAP <br />FOR PARTS NUMBERS ENDING <br />WITH "T" <br />A� <br />51.0" x 30.0" x 85.4" <br />45.9 CUBIC FEET <br />74.9 CUBIC FEET <br />75 LBS. <br />STUBS AT BOTTOM OF END CAP <br />FOR PARTS NUMBERS ENDING <br />WITH "B" <br />PIPE CONNECTION TO BOTTOM <br />OF END CAPS. <br />PART# <br />CHAMBER <br />PIPE SIZE <br />A B C <br />D <br />LIES BELOW THE BOTTOM OF THE END CAP <br />THAT THE OUTSIDE DIAMETER OF THE STUB IS <br />In mm 7 <br />T17T71n mm n --7 7TM71n mm <br />II <br />SC740EPE06B <br />SC 740 <br />6 in (150 mm) <br />10.90 in (277 mm) 3.85 in (98 mm) N/A <br />0.50 in (13 mm) <br />SC740EPE12T <br />SC 740 <br />12 in (300 mm) <br />14.70 in (373 mm) 7.70 in (196 mm) 12.50 in (318 mm) <br />N/A <br />SC740EPE12B <br />SC 740 <br />12 in (300 mm) <br />14.70 in (373 mm) 7.70 in (196 mm) N/A <br />1.20 in (30 mm) <br />SC740EPE15T <br />SC 740 <br />15 in (375 mm) <br />18.40 in (467 Tim) 10.36 in (263 mm) 9.00 in (229 mm) <br />N/A <br />SC740EPE15B <br />SC 740 <br />15 in (375 mm) <br />18.40 in (467 mm)10.36 in (263 mm) N/A <br />1.30 in (33 mm) <br />SC740EPE18T <br />SC 740 <br />18 in (460 mm) 19.70 in (500 Tim) 10.72 in (272 mm) 5.00 in (127 mm) <br />N/A <br />SC740EPE18B <br />SC 740 <br />18 in (460 mm) <br />19.70 in (500 Tim) in (272 mm) N/A <br />1.60 in (41 mm) <br />SC740EPE24B <br />SC 740 <br />24 in (600 mm) <br />18.50 in (470 mm) 9.45 in (240 mm) N/A <br />0.10 in (3 mm) <br />NOTE: ALL DIMENSIONS ARE NOMINAL <br />* FOR THE SC740EPE24B THE 24" STUB <br />ALL STUBS, EXCEPT FOR THE SC740EPE24B <br />2.13 THE CHAMBER SHALL BE MANUFACTURED IN AN ISO <br />ARE PLACED AT BOTTOM OF END CAP SUCH <br />LIES BELOW THE BOTTOM OF THE END CAP <br />THAT THE OUTSIDE DIAMETER OF THE STUB IS <br />APPROXIMATELY 1.75". BACKFILL MATERIAL <br />FLUSH WITH THE BOTTOM OF THE END CAP. <br />II <br />FOR ADDITIONAL INFORMATION CONTACT <br />SHOULD BE REMOVED FROM BELOW THE <br />STORMTECH AT 1-888-892-2694. <br />N-12 STUB SO THAT THE FITTING SETS LEVEL. <br />F� TECHNICAL DETAILS <br />STORMTECH PRODUCT SPECIFICATIONS <br />STORMWATER CHAMBER SPECIFICATIONS <br />Chambers shall be StormTech SC -740, SC -310 or approved equal. <br />1. Chambers shall conform to the requirements of ASTM F2418-05, <br />"Standard Specification for Polypropylene (PP) Corrugated Wall <br />Stormwater Collection Chambers". <br />2. Chamber rows shall provide continuous, unobstructed internal space <br />with no internal support panels. <br />3. The structural design of the chambers, the structural backfill and the <br />installation requirements shall ensure that the safety factors specified in <br />the AASHTO LRFD Bridge Design Specifications, Section 12.12 are <br />met for: 1) long -duration dead loads and 2) short -duration live loads, <br />based on the AASHTO Design Truck with consideration for impact and <br />multiple vehicle presences. <br />4. Only chambers that are approved by the engineer will be allowed. The <br />contractor shall submit (3 sets) of the following to the engineer for <br />approval before delivering chambers to the project site: <br />a. A structural evaluation by a registered structural engineer <br />that demonstrates that the safety factors specified in the <br />AASHTO LRFD Bridge Design Specifications, Section 12.12 <br />are met. The 50 -year creep modulus data specified in <br />ASTM 2418-05 must be used as part of the AASHTO <br />structural evaluation to verify long-term performance. <br />b. A certification by the manufacturer that the chambers are in <br />accordance with ASTM F2418-05. <br />5. Chambers shall be produced at an ISO 9001 certified manufacturing <br />facility. <br />6. All design specifications for chambers shall be in accordance with the <br />manufacturer's latest design manual. <br />7. The installation of chambers shall be in accordance with the <br />manufacturer's latest installation instructions. <br />1.0 <br />GENERAL <br />2.6 THE NOMINAL STORAGE VOLUME OF A JOINED STORMTECH <br />2.13 THE CHAMBER SHALL BE MANUFACTURED IN AN ISO <br />1.1 <br />CV <br />SC -740 CHAMBER SHALL BE 74.9 CUBIC FEET PER <br />II <br />II <br />9001:2000 CERTIFIED FACILITY. <br />II <br />CD <br />a <br />CHAMBER WHEN INSTALLED PER STORMTECH'S TYPICAL <br />THE RUNOFF FROM THE REQUIRED WATER QUALITY RAIN <br />II <br />EVENT. CHAMBERS ARE INTENDED TO BE FLAT, NO SLOPE, <br />LO <br />� v <br />LO <br />DETAILS (INCLUDES THE VOLUME OF CRUSHED ANGULAR <br />3.0 <br />END CAP PARAMETERS <br />II <br />v <br />STONE WITH AN ASSUMED 40% POROSITY). THIS EQUATES <br />3.1 <br />THE END CAP SHALL BE INJECTION MOLDED OF <br />ON SHEET C1. <br />Z aO <br />TO 2.2 CUBIC FEET OF STORAGE/SQUARE FOOT OF BED. <br />DETENTION OUTLET II <br />POLYPROPYLENE RESIN TO BE INHERENTLY RESISTANT <br />STRUCTURE. REFER TO II <br />CHAMBERS DETAIN AND ALLOW FOR THE METERED <br />THE NOMINAL STORAGE VOLUME OF AN INSTALLED <br />RECOMMENDATIONS. CONTACT STORMTECH FOR <br />TO ENVIRONMENTAL STRESS CRACKING, AND TO <br />FURTHER DETAILS. <br />= J <br />d W <br />STORMTECH SC -310 CHAMBER SHALL BE 31.0 CUBIC FEET <br />AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS LOADS SHALL BE CALCULATED IN ACCORDANCE WITH SECTION 3 AND SHALL INCLUDE H2O <br />MAINTAIN ADEQUATE STIFFNESS THROUGH HIGHER <br />. O <br />r` z <br />0 W <br />00 <br />PER CHAMBER WHEN INSTALLED PER STORMTECH'S <br />TEMPERATURES EXPERIENCED DURING INSTALLATION <br />2.0 <br />LID <br />(O J <br />TYPICAL DETAILS (INCLUDES THE VOLUME OF CRUSHED <br />W <br />AND SERVICE. <br />2.1 <br />_ <br />n <br />� a <br />ANGULAR STONE WITH AN ASSUMED 40% POROSITY). THIS <br />IQ <br />O <br />uj <br />3.2 <br />THE END CAP SHALL BE DESIGNED TO FIT INTO ANY <br />N <br />z <br />O <br />CORRUGATION OF A CHAMBER, WHICH ALLOWS: <br />ti <br />LO <br />co <br />j <br />CAPPING A CHAMBER THAT HAS ITS LENGTH TRIMMED; <br />Ja0 <br />W (-)X <br />W <br />SEGMENTING ROWS INTO STORAGE BASINS OF <br />E <br />2.7 PENETRATING THE SIDEWALLS TO ALLOW FOR LATERAL <br />VARIOUS LENGTHS. <br />W <br />Z < <br />aO <br />U <br />THE NOMINAL CHAMBER DIMENSIONS OF THE <br />-� <br />3.3 <br />Cl)Z <br />STORMTECH SC -740 SHALL BE 30.0 INCHES TALL, 51.0 <br />2.8 THE CHAMBER SHALL HAVE TWO ORIFICES NEAR ITS TOP TO <br />Q Lu <br />m <br />U <br />N <br />ALLOW FOR EQUALIZATION OF AIR PRESSURE BETWEEN ITS <br />a= <br />BE USED TO INLET THE SYSTEM. <br />d - <br />0 o <br />O z <br />0 <br />O <br />u.. <br />I^ <br />L, ) <br />THE END CAP SHALL HAVE EXCESS STRUCTURAL <br />LID <br />ZV. It <br />zM� <br />oN <br />__.) Ir- <br />; W <br />CHAMBER SHALL BE 85.4 INCHES. <br />p O <br />< <br />SIZE AT ANY INVERT ELEVATION. <br />0- r <br />�� <br />STORMWATER CHAMBER SPECIFICATIONS <br />Chambers shall be StormTech SC -740, SC -310 or approved equal. <br />1. Chambers shall conform to the requirements of ASTM F2418-05, <br />"Standard Specification for Polypropylene (PP) Corrugated Wall <br />Stormwater Collection Chambers". <br />2. Chamber rows shall provide continuous, unobstructed internal space <br />with no internal support panels. <br />3. The structural design of the chambers, the structural backfill and the <br />installation requirements shall ensure that the safety factors specified in <br />the AASHTO LRFD Bridge Design Specifications, Section 12.12 are <br />met for: 1) long -duration dead loads and 2) short -duration live loads, <br />based on the AASHTO Design Truck with consideration for impact and <br />multiple vehicle presences. <br />4. Only chambers that are approved by the engineer will be allowed. The <br />contractor shall submit (3 sets) of the following to the engineer for <br />approval before delivering chambers to the project site: <br />a. A structural evaluation by a registered structural engineer <br />that demonstrates that the safety factors specified in the <br />AASHTO LRFD Bridge Design Specifications, Section 12.12 <br />are met. The 50 -year creep modulus data specified in <br />ASTM 2418-05 must be used as part of the AASHTO <br />structural evaluation to verify long-term performance. <br />b. A certification by the manufacturer that the chambers are in <br />accordance with ASTM F2418-05. <br />5. Chambers shall be produced at an ISO 9001 certified manufacturing <br />facility. <br />6. All design specifications for chambers shall be in accordance with the <br />manufacturer's latest design manual. <br />7. The installation of chambers shall be in accordance with the <br />manufacturer's latest installation instructions. <br />1.0 <br />GENERAL <br />2.6 THE NOMINAL STORAGE VOLUME OF A JOINED STORMTECH <br />2.13 THE CHAMBER SHALL BE MANUFACTURED IN AN ISO <br />1.1 <br />STORMTECH CHAMBERS ARE DESIGNED TO CONTROL <br />SC -740 CHAMBER SHALL BE 74.9 CUBIC FEET PER <br />II <br />II <br />9001:2000 CERTIFIED FACILITY. <br />II <br />STORMWATER RUNOFF. AS A SUBSURFACE RETENTION <br />CHAMBER WHEN INSTALLED PER STORMTECH'S TYPICAL <br />THE RUNOFF FROM THE REQUIRED WATER QUALITY RAIN <br />II <br />EVENT. CHAMBERS ARE INTENDED TO BE FLAT, NO SLOPE, <br />SYSTEM STORMTECH CHAMBERS RETAIN AND ALLOW <br />DETAILS (INCLUDES THE VOLUME OF CRUSHED ANGULAR <br />3.0 <br />END CAP PARAMETERS <br />II <br />EFFECTIVE INFILTRATION OF WATER INTO THE SOIL. AS <br />STONE WITH AN ASSUMED 40% POROSITY). THIS EQUATES <br />3.1 <br />THE END CAP SHALL BE INJECTION MOLDED OF <br />ON SHEET C1. <br />A SUBSURFACE DETENTION SYSTEM, STORMTECH <br />TO 2.2 CUBIC FEET OF STORAGE/SQUARE FOOT OF BED. <br />DETENTION OUTLET II <br />POLYPROPYLENE RESIN TO BE INHERENTLY RESISTANT <br />STRUCTURE. REFER TO II <br />CHAMBERS DETAIN AND ALLOW FOR THE METERED <br />THE NOMINAL STORAGE VOLUME OF AN INSTALLED <br />RECOMMENDATIONS. CONTACT STORMTECH FOR <br />TO ENVIRONMENTAL STRESS CRACKING, AND TO <br />FURTHER DETAILS. <br />FLOW OF WATER TO AN OUTFALL. <br />STORMTECH SC -310 CHAMBER SHALL BE 31.0 CUBIC FEET <br />AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS LOADS SHALL BE CALCULATED IN ACCORDANCE WITH SECTION 3 AND SHALL INCLUDE H2O <br />MAINTAIN ADEQUATE STIFFNESS THROUGH HIGHER <br />gST STORMTECH SC -740 <br />PER CHAMBER WHEN INSTALLED PER STORMTECH'S <br />TEMPERATURES EXPERIENCED DURING INSTALLATION <br />2.0 <br />CHAMBER PARAMETERS <br />TYPICAL DETAILS (INCLUDES THE VOLUME OF CRUSHED <br />W <br />AND SERVICE. <br />2.1 <br />THE CHAMBER SHALL BE INJECTION MOLDED OF <br />ANGULAR STONE WITH AN ASSUMED 40% POROSITY). THIS <br />IQ <br />POLYPROPYLENE RESIN TO BE INHERENTLY RESISTANT <br />EQUATES TO 1.3 CUBIC FEET OF STORAGE/SQUARE FOOT <br />3.2 <br />THE END CAP SHALL BE DESIGNED TO FIT INTO ANY <br />TO ENVIRONMENTAL STRESS CRACKING (ESCR), AND TO <br />OF BED. <br />CORRUGATION OF A CHAMBER, WHICH ALLOWS: <br />MAINTAIN ADEQUATE STIFFNESS THROUGH HIGHER <br />CAPPING A CHAMBER THAT HAS ITS LENGTH TRIMMED; <br />TEMPERATURES EXPERIENCED DURING INSTALLATION <br />THE CHAMBER SHALL HAVE FORTY-EIGHT ORIFICES <br />SEGMENTING ROWS INTO STORAGE BASINS OF <br />AND SERVICE. <br />2.7 PENETRATING THE SIDEWALLS TO ALLOW FOR LATERAL <br />VARIOUS LENGTHS. <br />CONVEYANCE OF WATER. <br />2.2 <br />THE NOMINAL CHAMBER DIMENSIONS OF THE <br />00 <br />O <br />�r <br />3.3 <br />THE END CAP SHALL HAVE SAW GUIDES TO ALLOW EASY <br />STORMTECH SC -740 SHALL BE 30.0 INCHES TALL, 51.0 <br />2.8 THE CHAMBER SHALL HAVE TWO ORIFICES NEAR ITS TOP TO <br />CUTTING FOR VARIOUS DIAMETERS OF PIPE THAT MAY <br />H <br />INCHES WIDE AND 90.7 INCHES LONG. THE NOMINAL <br />ALLOW FOR EQUALIZATION OF AIR PRESSURE BETWEEN ITS <br />a= <br />BE USED TO INLET THE SYSTEM. <br />CHAMBER DIMENSIONS OF THE STORMTECH SC -310 <br />INTERIOR AND EXTERIOR. <br />SHALL BE 16.0 INCHES TALL, 34.0 INCHES WIDE AND 90.7 <br />u.. <br />3.4 <br />THE END CAP SHALL HAVE EXCESS STRUCTURAL <br />W <br />INCHES LONG. THE INSTALLED LENGTH OF A JOINED <br />2.9 THE CHAMBER SHALL HAVE BOTH OF ITS ENDS OPEN TO <br />ADEQUACIES TO ALLOW CUTTING AN ORIFICE OF ANY <br />� <br />CHAMBER SHALL BE 85.4 INCHES. <br />ALLOW FOR UNIMPEDED HYDRAULIC FLOWS AND VISUAL <br />Pr <br />SIZE AT ANY INVERT ELEVATION. <br />INSPECTIONS DOWN A ROW'S ENTIRE LENGTH. <br />2.3 <br />THE CHAMBER SHALL HAVE A CONTINUOUSLY CURVED <br />3.5 <br />THE PRIMARY FACE OF AN END CAP SHALL BE CURVED <br />SECTION PROFILE. <br />2.10 THE CHAMBER SHALL HAVE 14 CORRUGATIONS. <br />OUTWARD TO RESIST HORIZONTAL LOADS GENERATED <br />NEAR THE EDGES OF BEDS. <br />2.4 <br />THE CHAMBER SHALL BE OPEN -BOTTOMED. <br />2.11 THE CHAMBER SHALL HAVE A CIRCULAR, INDENTED, FLAT <br />SURFACE ON THE TOP OF THE CHAMBER FOR AN OPTIONAL <br />3.6 <br />THE END CAP SHALL BE MANUFACTURED IN AN ISO <br />2.5 <br />THE CHAMBER SHALL INCORPORATE AN OVERLAPPING <br />4 -INCH INSPECTION PORT OR CLEAN-OUT. <br />9001:2000 CERTIFIED FACILITY. <br />CORRUGATION JOINT SYSTEM TO ALLOW CHAMBER <br />ROWS OF ALMOST ANY LENGTH TO BE CREATED. THE <br />2.12 THE CHAMBER SHALL BE ANALYZED AND DESIGNED USING <br />OVERLAPPING CORRUGATION JOINT SYSTEM SHALL BE <br />AASHTO METHODS FOR THERMOPLASTIC CULVERTS <br />EFFECTIVE WHILE ALLOWING A CHAMBER TO BE <br />CONTAINED IN THE LRFD BRIDGE DESIGN SPECIFICATIONS, <br />TRIMMED TO SHORTEN ITS OVERALL LENGTH. <br />2ND EDITION, INCLUDING INTERIM SPECIFICATIONS <br />THROUGH 2001. DESIGN LIVE LOAD SHALL BE THE AASHTO <br />HS20 TRUCK. DESIGN SHALL CONSIDER EARTH AND LIVE <br />LOADS AS APPROPRIATE FOR THE MINIMUM TO MAXIMUM <br />SPECIFIED DEPTH OF FILL. <br />24 SC -740 STORMTECH <br />CHAMBERS <br />1�_IMATCIRIRQW I I <br />II <br />II <br />II <br />PROPOSEDLAYOUT <br />II <br />(6) SC -740 END CAPS; (24) SC -740 CHAMBERS <br />STORAGE PER CHAMBER (6" STONE BASE): 74.9 CF <br />I <br />TOTAL SYSTEM STORAGE (INCLUDES PERIMETER STONE): 1,797.6 CF <br />II <br />II <br />STORMTECH CHAMBER NARRATIVE: <br />II <br />STORMTECH CHAMBERS ARE DESIGNED TO FULLY CONTAIN <br />II <br />THE RUNOFF FROM THE REQUIRED WATER QUALITY RAIN <br />II <br />EVENT. CHAMBERS ARE INTENDED TO BE FLAT, NO SLOPE, <br />II <br />TO PROMOTE INFILTRATION AND GROUND WATER <br />� � N <br />o(DC\I <br />RECHARGE. LARGER STORM EVENTS PASS THROUGH <br />II <br />SYSTEM AND TO EXISTING STORM SYSTEM. <br />�z00 <br />co <br />REFER TO STORMWATER CALCULATIONS <br />W" <br />ON SHEET C1. <br />I <br />s.. <br />w <br />DETENTION OUTLET II <br />*NUMBER OF INSPECTION PORTS AND THEIR <br />STRUCTURE. REFER TO II <br />LOCATIONS TO BE DETERMINED PER MANUFACTURERS <br />SHEET C1 FOR DETAILS. I) <br />RECOMMENDATIONS. CONTACT STORMTECH FOR <br />1 <br />FURTHER DETAILS. <br />CHAMBERS SHALL MEET THE DESIGN REQUIREMENTS AND LOAD FACTORS SPECIFIED IN SECTION 12.12 OF THE LATEST EDITION OF THE <br />AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS LOADS SHALL BE CALCULATED IN ACCORDANCE WITH SECTION 3 AND SHALL INCLUDE H2O <br />DESIGN TRUCK, IMPACT FACTOR, MULTIPLE PRESENCE, AND LANE LOAD. <br />gST STORMTECH SC -740 <br />CHAMBER LAYOUT <br />00 L <br />LIM %W <br />Lft N <br />v <br />1 <br />N <br />O <br />00 <br />LOO <br />O M <br />N <br />N C� <br />�0W <br />Oo <br />00 Z <br />~ 2 <br />d"ID <br />ti <br />tr = <br />2 LU <br />� � N <br />o(DC\I <br />5o <br />p <br />�z00 <br />co <br />W" <br />N (n d' <br />s.. <br />w <br />h <br />C� <br />M.4 <br />V <br />cc <br />W <br />W <br />IQ <br />x <br />i••l <br />E <br />d' <br />_Leb <br />GO* <br />00 <br />O <br />�r <br />Z <br />H <br />a= <br />� <br />R <br />H <br />u.. <br />W <br />'QA <br />O <br />� <br />Pr <br />O <br />1 <br />N <br />O <br />00 <br />LOO <br />DATE: 8-22-14 <br />REVISION <br />DATE: 12-4-14 <br />z 0� <br />0D <br />�0W <br />w-0 <br />~ 2 <br />d"ID <br />= <br />2 LU <br />� � N <br />o(DC\I <br />�z00 <br />co <br />M � r <br />N (n d' <br />DATE: 8-22-14 <br />REVISION <br />DATE: 12-4-14 <br />