Laserfiche WebLink
000'5 PARKING <br />SUV NO SCALE <br />T <br />GROUND LUG. <br />LEVELING NUT O <br />AND WASHER. <br />10 <br />I <br />N #6 BARE <br />COPPER <br />GROUND. <br />T <br />Ll I <br />CADWELD TOi <br />GROUND ROD <br />z� <br />ip <br />DETECTABLE PLASTIC WARNING <br />TAPE. (SPEC 26 05 53). <br />IN <br />r /� j/� <br />VERIFY <br />THE <br />INSTIALLATION <br />DEPTH <br />WITH THE <br />LOCAL <br />AUTHORITIES. <br />6" <br />11 <br />6" <br />#3 REBAR TIES AT 16" 0. C. <br />#6 REBAR (TYP. OF 8). <br />ELECTRICAL CONDUIT. <br />ANCHOR BOLTS FURNISHED BY <br />POLE MANUFACTURER. <br />** MATCH MANUFACTURER'S <br />ANCHOR BOLT PATTERN <br />PACK GROUT UNDER POLE TO <br />PROVIDE FULL CONTACT WITH <br />FOOTING. <br />RADIUS EDGE. <br />3 - #3 TIES AT TOP. <br />CUTOFF TYPE LUMINAIRE(S). <br />:R TO SITE UTILITIES PLAN <br />LOCATIONS AND <br />NTATIONS. REFER TO <br />TING FIXTURE SCHEDULE FOR <br />;IFICATIONS. <br />POLE. <br />;RETE BASE. <br />GRADE <br />LOT LIGHTING <br />CONCRETE <br />'4 POLE BASE DETAIL <br />SU1% NO SCALE <br />FINISHED GRADE <br />SELECTED BACKFILL <br />CLEAN GRAVEL UNDER <br />PAVEMENT. <br />.1/2- LIMESTONE GRAVEL. <br />PIPE <br />PIPE <br />INSTALLATION DETAIL <br />SU1 NO SCALE <br />TRENCH WIDTH <br />AS REQUIRED. <br />DETECTABLE PLASTIC <br />WARNING TAPE. <br />(SPEC 26 05 53). <br />. <br />24" MINIMUM FOR <br />(0-60OV) ELECTRIC <br />SERVICE AND <br />TELEPHONE SERVICE. <br />48" MINIMUM FOR <br />GREATER THAN 600V. <br />NOTES: <br />1. WHERE CROSSING <br />OTHER UTILITIES, MAINTAIN <br />12" CLEARANCE. <br />2. TRENCH DEPTHS SHALL <br />COMPLY WITH LOCAL <br />ELECTRIC AND TELEPHONE <br />UTILITY COMPANY <br />CONSTRUCTION STANDARDS. <br />SELECTED BACKFILL - <br />CLEAN GRAVEL UNDER <br />PAVEMENT/CONCRETE. <br />M. <br />CLEAN SAND OR SOIL, <br />COMPACTED 95% <br />PROCTOR DENSITY. <br />ELECTRICAL CONDUIT(S). <br />REFER TO ELECTRICAL <br />2v+ PLAN FOR QTY. <br />2" MINIMUM <br />BETWEEN <br />CONDUITS. <br />27 <br />UNDERGROUND <br />ELECTRICAL CONDUITS <br />SU1 NO SCALE <br />ANCHOR BOLTZL <br />SQUARE <br />LOCATION INSTRAIGHT <br />ANCHOR ROD RELATION TOPOLE <br />HEX NUT SHAFT <br />\ - ROTATION <br />PLAIN WASHER \\ ANDHOLE <br />BASE PLATE \ <br />GROUT FINISH <br />GRADEGROUT AFTER BOLT <br />PROJECTION <br />POLE IS SET <br />AND PLUMBED <br />PLAIN WASHER - <br />HEX NUT - 1"0 x 36" HEADED ANCHOR BOLTS <br />/(GRADE F1554) WITH HARDENED STEEL <br />FOUNDATION - WASHERS. WHEN DESIGN WIND SPEED <br />LEVEL EXCEEDS 110 MPH, GRADE F1554 <br />(Fy=55ksi) BOLTS MUST BE USED <br />ANCHOR BOLT DETAIL <br />BASE DIAGRAM <br />SU1l NO SCALE <br />EXIII//TNG 12" <br />WA <br />NEW UNDERGROUNQ'/ELECTRIC <br />2 SERVICE. REFER T ELECTRIC <br />SERVICE DIAGRAM FOR RE IREMENT . <br />E3 PRIOR TO INSTALLATION, NTRACTO <br />SHALL COORDINATE ITH UTILI <br />COMPANY, TO CONFIRM OUTE A D <br />4EXISTING POLE MOUNTED TRANSF <br />O EXISTING <br />ELECTRICAL VAULT <br />O <br />IREMEN . <br />FIRE /I <br />ANT. <br />EXISTING 6" <br />0 <br />I_ <br />1 64X36 HEADED ANCHOR BOLTS <br />(GRADE F1554) WITH HARDENED <br />ELECTRIC: <br />EXCEL ENERGY, HANS WENTHE <br />STEEL WASHERS. WHEN DESIGN <br />(651) 462-6205 <br />TELEPHONE: <br />WIND SPEED EXCEEDS 100MPH, <br />UGE <br />(651) 730-1365 <br />GRADE F1554 (Fy=55ksi) BOLTS <br />EXCEL ENERGY, KATHY RONNING <br />T <br />MUST BE USED. <br />WATER: <br />CITY OF HUGO PUBLIC WORKS, STEVE DUFF <br />OHT <br />(651) 762-6316 <br />SEWER: <br />FINISH GRADE.;zz <br />GS <br />(651) 762-6316 <br />(8)-#6 BARS VERT. (ARRANGED <br />SYMMETRICALLY AROUND PERIMETER <br />Q� <br />® <br />OF CONCRETE PIER). <br />1%; <br />ix <br />TACK WELD ANCHOR NUT & <br />E <br />W <br />1/4 x3 x3 PLATE WASHER TO <br />M 0- <br />A� <br />BOLT. <br />ELECTRICAL <br />W <br />CONDUIT. <br />3/4" x 10' <br />R <br />GROUND ROD. <br />V <br />18" DIAMETER #3 REBAR TIES <br />v _STRM <br />' <br />SPACED AT 16 O.C. <br />CONCRETE <br />'4 POLE BASE DETAIL <br />SU1% NO SCALE <br />FINISHED GRADE <br />SELECTED BACKFILL <br />CLEAN GRAVEL UNDER <br />PAVEMENT. <br />.1/2- LIMESTONE GRAVEL. <br />PIPE <br />PIPE <br />INSTALLATION DETAIL <br />SU1 NO SCALE <br />TRENCH WIDTH <br />AS REQUIRED. <br />DETECTABLE PLASTIC <br />WARNING TAPE. <br />(SPEC 26 05 53). <br />. <br />24" MINIMUM FOR <br />(0-60OV) ELECTRIC <br />SERVICE AND <br />TELEPHONE SERVICE. <br />48" MINIMUM FOR <br />GREATER THAN 600V. <br />NOTES: <br />1. WHERE CROSSING <br />OTHER UTILITIES, MAINTAIN <br />12" CLEARANCE. <br />2. TRENCH DEPTHS SHALL <br />COMPLY WITH LOCAL <br />ELECTRIC AND TELEPHONE <br />UTILITY COMPANY <br />CONSTRUCTION STANDARDS. <br />SELECTED BACKFILL - <br />CLEAN GRAVEL UNDER <br />PAVEMENT/CONCRETE. <br />M. <br />CLEAN SAND OR SOIL, <br />COMPACTED 95% <br />PROCTOR DENSITY. <br />ELECTRICAL CONDUIT(S). <br />REFER TO ELECTRICAL <br />2v+ PLAN FOR QTY. <br />2" MINIMUM <br />BETWEEN <br />CONDUITS. <br />27 <br />UNDERGROUND <br />ELECTRICAL CONDUITS <br />SU1 NO SCALE <br />ANCHOR BOLTZL <br />SQUARE <br />LOCATION INSTRAIGHT <br />ANCHOR ROD RELATION TOPOLE <br />HEX NUT SHAFT <br />\ - ROTATION <br />PLAIN WASHER \\ ANDHOLE <br />BASE PLATE \ <br />GROUT FINISH <br />GRADEGROUT AFTER BOLT <br />PROJECTION <br />POLE IS SET <br />AND PLUMBED <br />PLAIN WASHER - <br />HEX NUT - 1"0 x 36" HEADED ANCHOR BOLTS <br />/(GRADE F1554) WITH HARDENED STEEL <br />FOUNDATION - WASHERS. WHEN DESIGN WIND SPEED <br />LEVEL EXCEEDS 110 MPH, GRADE F1554 <br />(Fy=55ksi) BOLTS MUST BE USED <br />ANCHOR BOLT DETAIL <br />BASE DIAGRAM <br />SU1l NO SCALE <br />EXIII//TNG 12" <br />WA <br />NEW UNDERGROUNQ'/ELECTRIC <br />2 SERVICE. REFER T ELECTRIC <br />SERVICE DIAGRAM FOR RE IREMENT . <br />E3 PRIOR TO INSTALLATION, NTRACTO <br />SHALL COORDINATE ITH UTILI <br />COMPANY, TO CONFIRM OUTE A D <br />4EXISTING POLE MOUNTED TRANSF <br />O EXISTING <br />ELECTRICAL VAULT <br />O <br />IREMEN . <br />FIRE /I <br />ANT. <br />EXISTING 6" <br />0 <br />I_ <br />NEW UTILITIES <br />(SYMBOLS APPLY ONLY WHEN USED ON DRAWINGS) <br />UTILITY COMPANY CONTACTS <br />ELECTRIC: <br />EXCEL ENERGY, HANS WENTHE <br />FIRE SERVICE <br />(651) 462-6205 <br />TELEPHONE: <br />CENTURY LINK, PATRICK SLAVIK <br />UGE <br />(651) 730-1365 <br />GAS: <br />EXCEL ENERGY, KATHY RONNING <br />T <br />(651) 462-6201 <br />WATER: <br />CITY OF HUGO PUBLIC WORKS, STEVE DUFF <br />OHT <br />(651) 762-6316 <br />SEWER: <br />CITY OF HUGO PUBLIC WORKS, STEVE DUFF <br />GS <br />(651) 762-6316 <br />NEW UTILITIES <br />(SYMBOLS APPLY ONLY WHEN USED ON DRAWINGS) <br />WS <br />WATER SERVICE <br />FIRE SERVICE <br />F <br />SAN <br />SANITARY SEWER <br />UGE <br />U/G ELECTRIC <br />UGT <br />U/G PHONE <br />T <br />U/G PHONE <br />(BY PHONE CO.) <br />OHE <br />OVERHEAD ELECTRIC <br />OHT <br />OVERHEAD PHONE <br />H :2 _ <br />CONNECTING TO EXISTING <br />GS <br />GAS SERVICE <br />(BY GAS CO.) <br />® <br />SAW CUT <br />® <br />BORE <br />P.O.C. = POINT OF CONNECTION BETWEEN SITE <br />PIPING (SPEC 33 00 00) AND BUILDING PIPING <br />(SPEC 22 00 00, 21 13 13). AS NECESSARY - <br />SPEC 22 00 00 DENOTES LANDSCAPE IRRIGATION. <br />-�I I2 <br />CONNECT NEW SEWER SERVICE TO EXISTING 8" <br />XISTING SEWER MANHOLE. FIELD SANITARY SI <br />TO TRENCHING. INVERT: 92 . ❑� <br />HIGHEST (ASSUMED <br />T - --- f <br />ND E+ <br />N SU PLIE 1E �4 "Si — — _ _ = II 4,. I IlI <br />5' II <br />NEW SANITARY II <br />SEWER SERVICE. 3 <br />SU I Il II I <br />5 �~5 EXISTING' STORM I II <br />P.' 4"` II I SEWER. / <br />P1 <br />ELEVATION: II ' <br />0 Reilly Auto Parts (ASSUMED). II l I I <br />SQ. FT. = 7,067 <br />FLOOR ELEVATION: 933.5' <br />oj6 <br />UGE ' <br />3 <br />SU1 DOMESTIC WATER ��EXISTING 6" WATER <br />SERVICE. LATERAL. <br />W- <br />14 7TH STREET N. <br />W <br />"S1" <br />1 <br />/ 11 <br />-- 1 ---L-- 11 -J <br />EXISTING 12" DIP <br />WATER. <br />/EXISTING 8" PVC <br />SANITARY SEWER. <br />0 SAN <br />/ EXISTING 15" RCP <br />/ STORM SEWER. <br />STRM <br />SITE UTILITIES PLAN <br />SU1% SCALE, 1"-20' <br />I <br />I <br />I <br />I <br />/ I <br />I <br />1, I <br />G <br />W <br />SAN <br />GRAVEL CROSSING NOTE, <br />WHERE NEW UTILITY SERVICES ARE ROUTED UNDER <br />EXISTING GRAVEL AREAS, ALL EXISTING GRAVEL SHALL BE <br />REMOVED IN THE FOLLOWING STEPS: <br />1) REMOVAL & TRENCHING <br />2) INSTALLATION OF UTILITY <br />3) BACKFILL & COMPACTION <br />4) INSTALLATION OF NEW GRAVEL THAT MATCHES THE <br />EXISTING SURROUNDINGS IN BOTH MATERIAL AND <br />ELEVATION. <br />CONTRACTOR SHALL COORDINATE, OBTAIN & PAY FOR <br />ALL REQUIRED PERMITS & LICENSES TO PERFORM THIS <br />WORK & SHALL BE RESPONSIBLE FOR ALL TRAFFIC <br />CONTROL. <br />NOTES <br />O1 PULL THRU VENSTAR SURVEYOR/LIGHTING CONTROL <br />PANEL. SEE SHEET VS1 AND VENSTAR SCOPE OF <br />WORK. <br />O2 NEW UNDERGROUND PHONE SERVICE CONDUIT. ALL <br />BENDS SHALL BE LONG SWEEP TYPE. CONTRACTOR <br />SHALL CONTACT LISTED PHONE COMPANY CONTACT <br />PERSON. MEET THEM ON SITE, AND DETERMINE EXACT <br />ROUTE FOR CONDUIT. REFER TO TELEPHONE SERVICE <br />REQUIREMENTS. INCLUDE ALL CONDUIT ANO TRENCHING <br />IN BID. <br />BRANCH CIRCUIT & FEEDER SCHEDULE <br />(D 2 - #8 AND 1 - #8 GROUND IN 0.75" CONDUIT. <br />O 3 - #10 AND 1 - #10 GROUND IN 1" CONDUIT. <br />GENERAL NOTESi <br />1. BRANCH CIRCUIT CONDUCTOR SIZES ARE <br />INCREASED, TO ALLOW FOR VOLTAGE DROP. <br />2. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY <br />COMPANIES, USING UTILITY COMPANY CONTACT <br />INFORMATION GIVEN. COORDINATE FOR ALL <br />UTILTY WORK SHOWN. GIVE UTILITY COMPANIES <br />NOTICE OF CONSTRUCTION START DATE AND <br />ESTIMATED COMPLETION DATE. <br />3. GENERAL CONTRACTOR SHALL CONFIRM THAT LIGHT <br />POLES, LANDSCAPING AND UTILITIES DO NOT <br />CONFLICT WITH SIGN LOCATION SHOWN. IF ANY <br />POTENTIAL CONFLICT IS DISCOVERED, GENERAL <br />CONTRACTOR SHALL CONTACT THE O'REILLY <br />EXISTING PROJECT ADMINISTRATOR BEFORE PROCEEDING. <br />ELECTRICAL VAULT <br />ONE CAQ <br />SO <br />Oma? n <br />S2 <br />�j <br />20 0 20 40 60 <br />O <br />\cq<< BEFORE y <br />NORTH GRAPHIC SCALE - FEET <br />TELEPHONE SERVICE REQUIREMENTS <br />SPECIAL NOTE: NEW SERVICE TO BUILDING SHALL BE AN <br />UNDERGROUND SERVICE, CONTRACTOR SHALL SCHEDULE INSTALLATION <br />OF U/G TELEPHONE SERVICE CONDUIT WITH OWNER. CONTACT <br />(417)874-7288. <br />SCHEDULE 40 PVC CONDUIT WITH RIGID GALVANIZED STEEL LONG <br />SWEEP BENDS ® 18"-24" DEPTH FOR PHONE SERVICE. PROVIDE <br />MINIMUM l/4" POLYPROPYLENE PULL LINE. PLACE CONDUIT A <br />MINIMUM OF 12" FROM U/G ELECTRICAL CONDUITS IN SAME TRENCH. <br />CAP CONDUIT AT PROPERTY LINE BELOW FINISHED GRADE AND INSTALL <br />CABLE MARKER FOR PHONE COMPANY, IF NECESSARY. OTHERWISE, <br />-CONTINUE PHONE SERVICE CONDUIT TO A POLE AND INSTALL RIGID <br />GALVANIZED STEEL CONDUIT TO A MINIMUM 10' ABOVE FINISH GRADE, <br />ATTACHED TO POLE. <br />CONTRACTOR SHALL COORDINATE INSTALLATION AND VERIFY <br />REQUIREMENTS WITH PHONE COMPANY, PLUS INCLUDE ALL FEES (IF <br />ANY) BY PHONE COMPANY FOR INSTALLATION OF NO LESS THAN 10 <br />PAIR CABLE, IN MENTIONED CONDUIT, TO CONTRACTOR INSTALLED <br />4'x8'x3/4" BACKBOARD WITHIN BUILDING. CONTRACTOR SHALL PROVIDE <br />#6 AWG CU. GROUND TO TELEPHONE EQUIPMENT LOCATION, FROM <br />ELECTRICAL GROUNDING ELECTRODE SYSTEM. FINAL CONNECTIONS AND <br />INSIDE PHONE WIRING BY OWNER. <br />ONLY IF UNDERGROUND PHONE SERVICE IS NOT AVAILABLE. THEN MAY <br />CONTRACTOR INSTALL APPROPRIATE OVERHEAD PHONE SERVICE RISER. <br />WEATHERHEAD ETC COORDINATE WITH OWNER AND PHONE CO <br />SAWCUT NOTE <br />WHERE NEW UTILITY SERVICES ARE ROUTED UNDER EXISTING PAVED <br />AREAS, ALL EXISTING PAVING SHALL BE REMOVED IN THE FOLLOWING <br />STEPS: <br />1) SAWCUTTING PAVING. <br />2) REMOVAL AND TRENCHING. <br />3) INSTALLATION OF UTILITY. <br />4) BACKFILL AND COMPACTION <br />5) INSTALLATION OF NEW PAVING THAT MATCHES THE EXISTING <br />SURROUNDING PAVING IN BOTH MATERIAL AND ELEVATION. <br />CONTRACTOR SHALL COORDINATE, OBTAIN AND PAY FOR ALL REQUIRED <br />PERMITS AND LICENSES TO PERFORM THIS WORK AND SHALL BE <br />RESPONSIBLE FOR ALL TRAFFIC CONTROL WHILE PERFORMING <br />SAWCUTTING OPERATIONS AS NECESSARY. <br />CONTRACTOR CAUTIONII <br />VERIFY SEWER LINE ELEVATION <br />BEFORE STARTING ANY BUILDING PAD GRADING AND PLUMBING WORK <br />THE CONTRACTOR SHALL FIELD VERIFY LOCATION, MATERIAL, <br />CONDITION, ACCESSIBILITY (INCLUDING STATE HIGHWAY OR OTHER <br />RIGHTS-OF-WAY) AND WORKABLE FLOW LINE ELEVATION OF THE <br />EXISTING SANITARY SEWER SERVICE LINE OR MAIN. <br />IF A WORKABLE FLOW LINE HAS NOT BEEN ESTABLISHED AT THE TIME <br />OF FINAL SANITARY SEWER SERVICE CONNECTION. THEN THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXPENSES ASSOCIATED <br />WITH THE INSTALLATION OF A NEW GRINDER PUMP SYSTEM TO MEET <br />OWNER AND LOCAL REQUIREMENTS. <br />EXISTING CONDITIONS NOTES <br />1. EXISTING INSTALLATIONS (SUCH AS WATER MAINS/LINES, GAS <br />MAINS/LINES, SEWER MAINS/LINES, TELEPHONE LINES, POWER LINES, <br />AND UTILITY STRUCTURES IN THE VICINITY OF THE WORK TO BE <br />DONE) ARE INDICATED ON THE DRAWINGS ONLY TO THE EXTENT THAT <br />SUCH INFORMATION HAS BEEN MADE AVAILABLE TO OR DISCOVERED <br />BY THE ENGINEER IN PREPARING THE DRAWINGS. THERE IS NO <br />GUARANTEE AS TO THE ACCURACY OR COMPLETENESS OF SUCH <br />INFORMATION, AND ALL RESPONSIBILITY FOR THE ACCURACY AND <br />COMPLETENESS THEREOF IS EXPRESSLY DISCLAIMED. <br />2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING <br />ALL EXISTING INSTALLATIONS. <br />00 �n <br />Lm N v <br />o. <br />J <br />m z <br />ct: Q <br />0 <br />tel' <br />Ez <br />b <br />C3 <br />a <br />0 <br />a <br />a <br />a <br />N <br />CD <br />00 <br />NN <br />0 0 0 <br />00 0o ,^a; <br />- <br />r• r• >_ <br />;! <br />met <br />W(_n0O <br />ae <br />H :2 _ <br />Nets. <br />= W (.0 <br />a <br />ix <br />O Ocoo <br />Z <br />E <br />W <br />M 0- <br />A� <br />C,4 U) It <br />W <br />W <br />R <br />V <br />x <br />t/1 <br />V <br />r- <br />I" CD <br />0 <br />v 00 <br />Net <br />o <br />VJ <br />con .. <br />0 <br />Gorn P= <br />Z <br />cc <br />o � <br />M ar <br />r• c <br />H <br />o. <br />J <br />m z <br />ct: Q <br />0 <br />tel' <br />Ez <br />b <br />C3 <br />a <br />0 <br />a <br />a <br />a <br />DATE: 12-4-14 <br />REVISION <br />DATE: <br />SU1 0� 1 <br />N <br />CD <br />00 <br />co <br />z of <br />- <br />0O <br />0--co <br />W(_n0O <br />H :2 _ <br />= W (.0 <br />E N <br />O Ocoo <br />Z <br />U 00 <br />M 0- <br />C,4 U) It <br />DATE: 12-4-14 <br />REVISION <br />DATE: <br />SU1 0� 1 <br />