My WebLink
|
Help
|
About
|
Sign Out
Home
2018.05.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.05.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:30:59 PM
Creation date
5/4/2018 9:23:53 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/7/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/A <br />ffYS <br />& Associates, Ine. <br />April 20, 2018 <br />Ms. Rachel Juba <br />City Planner <br />Infrastructure ■ Engineering ■ Planning ■ Construction <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Final Site Plan Review <br />Schwieters Expansion <br />WSB Project No. 011038-000 <br />Dear Ms. Juba: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the final site plan submittal for the above -referenced project. In particular, <br />we have reviewed the following plans related to this particular request: <br />• Schwieters Expansion Project Narrative prepared by AMI Consulting Engineers dated <br />4/10/2018 <br />• Landscape Plans prepared by AMI Consulting Engineers dated 4/10/2018 <br />• Civil Plans prepared by AMI Consulting Engineers dated 4/10/2018 <br />• Architectural Plans by AMI Consulting Engineers dated 4/10/2018 <br />• Lighting Plan by Mlazgar Associates dated 4/10/2018 <br />Based on the review of the site plan, we offer the following comments related to this application: <br />Final Plat <br />1. Provide additional drainage and utility easement for the sanitary sewer (45' wide) <br />extending along the eastern property line to a point 15' past the southernmost manhole. <br />Stormwater Management <br />2. The applicant is proposing to utilize pretreatment ponds, infiltration basins and filtration <br />basins to conform with stormwater management requirements. Treated Stormwater is <br />discharged into the wetland complex to the west as well as the storm sewer system along <br />the east side of Fenway Avenue. <br />3. Stormwater management is designed to accommodate this initial phase as well as future <br />buildout phases for the site. <br />4. Required freeboard from groundwater, 100-year high water levels, and emergency <br />overflow elevations with respect to the lowest floor elevation are met. <br />S. IUse R JubalRachellDEVELOPMENTPROJECTSToy Molitor AdditionWoy Molitor 2ndAdditionlOut1otAWog Memo Schwieters Expansion-041918.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.