My WebLink
|
Help
|
About
|
Sign Out
Home
2018.05.07 RESO 2018-13 Schwieters Site Plan
Hugo
>
City Council
>
City Council Resolutions
>
2018 CC Resolutions
>
2018.05.07 RESO 2018-13 Schwieters Site Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 1:57:17 PM
Creation date
5/8/2018 1:57:17 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
5/7/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2018-13 <br />Page 2 <br />9. The applicant shall submit a revised lighting plan that meets the City's lighting <br />ordinance to be reviewed and approved by staff. <br />10. The applicant shall submit cut sheets for the wall mounted light fixtures to be <br />reviewed and approved by staff. <br />11. The applicant shall submit fencing details to be reviewed and approved by staff. <br />12. The applicant shall submit the final building material samples and colors for the <br />building to be reviewed and approved by staff. <br />13. The internal roof drainage system that shall be integrated into the building design and <br />shall be reviewed and approved by staff. <br />14. The trash enclosures and wood scrap containers shall be internal to the building or <br />screened with materials consistent with the building material and shall be reviewed <br />and approved by staff. <br />15. The applicant shall pay $15,000.00 to the City for the upsizing of the lift station on <br />140'' Street to serve the development. <br />Prior to issuance of a Certificate of Occupancy: <br />16. The applicant shall restore any part of the Fenway Boulevard Trail that is damaged <br />during construction. <br />17. All roof top and ground mechanical equipment must be screened from view of <br />adjacent properties. Staff shall perform an inspection when equipment is installed to <br />ensure compliance with City code. <br />18. All required landscaping shall be fully installed. <br />19. Drainage and utility easements shall be dedicated to the City over the wetland, <br />stormwater management facilities, and sewer extensions. <br />20. A maintenance agreement for the stormwater management facilities between the City <br />and the applicant shall be reviewed and approved by the City then recorded against <br />the property prior to the start of grading activities on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.