Laserfiche WebLink
Resolution 2018-15 <br />Page 2 <br />i. Include utility and stormwater management/reuse installation in the <br />phasing plan. <br />6. The preliminary phasing plan per plans dated February 5, 2018, revised March 19, <br />2018, shall be revised to include utility and stormwater management/reuse <br />installation. The revised plan shall be reviewed and approved by staff. <br />a. Phase 1 shall include: <br />i. Outlot J shall be dedicated to the City. <br />ii. Connection to the park on the east end of Ethan Trail <br />b. Phase 2 shall include: <br />i. The extension of Oneka Parkway to the north plat boundary. <br />ii. Connection to the park on the east end of Ethan Trail around the <br />stormeater pond. <br />7. The building setbacks and impervious surface requirements for the development are <br />as follows: <br />55' Wide 65' and 70' <br />Villa Lots Wide Lots <br />Front Setback 25 Ft 25 Ft <br />Side Setback 7.5 Ft 7.5 Ft <br />Rear Setback 1 30 Ft 130 Ft <br />Lot Impervious 150% 150% <br />8. Outlot Use and Ownership <br />a. Outlots A, B, C, D, E, F, G, H, and I, are proposed for stormwater <br />ponding, wetlands, and landscaping and shall be deeded to the City. <br />b. Outlot J is proposed for a public park and stormwater ponding and shall be <br />deeded to the City. A road may be installed by the City within Outlot J for <br />access to the park or by adjacent property owners to access the property to <br />the east. <br />9. The developer has indicated that an HOA will be established for the development to <br />own/operate/maintain landscaping within the outlots, landscaping along Oneka <br />Parkway, and the water re -use system. The HOA documents shall be reviewed and <br />approved by staff prior to the recording of the final plat for Phase 1. <br />10. The landscaping planned for the development shall be installed all at the same time <br />during each phase. The developers shall take proper precautions to protect the trees as <br />the homes are being built. <br />