My WebLink
|
Help
|
About
|
Sign Out
Home
2018.06.18 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.06.18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:13:12 PM
Creation date
6/15/2018 2:55:08 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/18/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AlA Document G702'" —1992 <br />Application and Certificate for Payment <br />TO OWNER: City of Hugo PROJECT: Hugo Fire Station <br />14669 Fitzgerald Avenue North 5323 140th Street North <br />Hugo MN 65038 Hugo MN 55038 <br />FROM CONTRACTOR: Diverse Construction ServicesVI&P&CHITECT- Roof Spec, Inc. <br />Remit payments to: 2400 Prior Avenue North <br />82 - 38th Avenue NE St Paul MN 56113 <br />Columbia Heights MN 55421-3502 OTHER ❑ <br />CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information <br />Application is made forpayment, as shown below, in connection with the Contract. and belief the Work covered by this Application for payment has been completed in :accordance <br />AIA Document 0703TM, Continuation Sheet, is attached. with the Contract Documents, that all amounts have been paid by the Contractor for Work for <br />168,137.00 which previous Certificates for Payment were issued and payments received from the Owner, and <br />1. ORIGINAL CONTRACT SUM ................................................. S that current paymen • wn herein ispuw due. <br />2. NET CHANGE BY CHANGE ORDERS .............................. $ _______0750 CONTRACTOR <br />3. CONTRACT SUM TO DATE I Line 0 <br />( i�..................................... $ By: `��..r �'x3i �c. Date: <br />4. TOTAL COMPLETED & STORED TO DATE Column G au G703) ...... S State of. r <br />( <br />5. RETAINAGE: Colin of:d <br />a. 5.00% ofCamplcled Will Sul ibc and wor obefore <br />8,009.35 3i� day of JIB{ i <br />(C'nlumias D +Eat G7f1.1) S _ n . th <br />b. .5.00 % of Stored Material <br />(Cabman f on Gip?) $ 0.00 No blic: JENN SLM PLAN <br />hty c rm iissi expires: NOTARYPIlIM-UNIrEiOTA <br />Total Retainage (Litaes 5a + Sb, nr Tntol in Calnnvt L of G703J...... $_ 8,009.35 1131170 lewcolillismEll"W0113IXE) <br />6. TOTAL EARNED LESS RETAINAGE.................................... $ 162,177.65 A CHITECT'S CE TI ICATE FOR P <br />(Line 9 minus Line 5 Twal) In accordance with the Contract Documents, based on on -site observations and the data comprising <br />7. LESS PREVIOUS CERTIFICATES FOR PAYMENT ...................... S 63,620.26 this application, the Architect certifies to the Owner that to the best of the Architect's knowledge, <br />intlimation and belief the Work has progressed as indicated, the quality oP the Work is in <br />(Line 6fi'omprior Ceriifrcaie) accordance with the Contact Documents, and the Contractor is entitled to payment of the <br />S. CURRENT PAYMENT DUE ................. ��$-557.? AMOUNT CERTIFIED. <br />...........................• <br />9. BALANCE TO FINISH, INCLUDING RETAINAGE AMOUNT CERTIFIED.......................................................................... S 88,557.39 <br />(Line 3 minus Line 6) $ 15,959.35 (Ahuch erplanntion if amount certified differs fiwin the anrount applied bliticrl (4lifigures on 1hir <br />Application and on the Continuation Sheer ilia/ are changed to conform with the eanown cerlifced) <br />HANGEORDER SUMMARY ADDITIONS DEDUCTIONS ARCHITECT: <br />I oral changes approved in previous nhonths by Owner S _ $ By: Darr. 6/13/2018 <br />Iola) approved this month $ This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor <br />TOTAL 1 S S named herein. Issuance, payment and acceptance ofpaynlent arc without prejudice to any rights of <br />ET CHANGES by Chang, 0, or $ the Owner or Contractor under this Contract. <br />CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will (lot be obscured. <br />AIA Document G702- —1992. Copyright © 1953, 1963. 1965, 1971, 1976, 1963 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA•' Document is protected by U.S. Copyright Law <br />and International Treaties. Unauthorized reproduction or distribution of this AIA`- Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent <br />possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed, To report copyright violations of AIA Contract Documents, e-mail The American Institute of Archiects' legal <br />counsel, copyright@aia.org. n <br />APPLICATION NO: 2 <br />Distribution to. <br />PERIOD TO: 06/13/201 B <br />OWNER <br />Cl <br />CONTRACT FOR: <br />ARCHITECT <br />❑ <br />CONTRACT DATE: <br />CONTRACTOR <br />❑ <br />PROJECT NOS: / / <br />FIELD <br />❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.