Laserfiche WebLink
Prior to the issuance/approval of a building permit final the following conditions <br />must be met/completed: <br />20. All exterior electrical or other service lines shall be buried underground. The <br />collection system may be placed overhead near substations or points of <br />interconnection to the electrical grid. <br />21. All landscaping shall be installed in accordance with the approved landscape plan. <br />22. The solar energy panels shall be installed as to have the same elevation and be <br />consistent throughout the site. <br />23. Solar energy system components shall be labeled with the manufacturers name <br />and address, model number, and serial number. <br />24. The solar farm shall be in compliance with the adopted city and state building <br />code, electrical code, and plumbing code, as amended and receive any necessary <br />permits or approvals from any regulatory agency having jurisdiction. <br />ADOPTED by the City Council this day of , 2018. <br />Tom Weidt, Mayor <br />STATE OF MINNESOTA ) <br />) ss. <br />COUNTY OF WASHINGTON) <br />On this day of , 2018, before me, a Notary <br />Public, personally appeared Tom Weidt, Mayor of the City of Hugo, a Minnesota <br />municipality within the State of Minnesota, and that said instrument was signed on behalf of <br />the City of Hugo by the authority of the City Council of the City of Hugo, and Tom Weidt, <br />Mayor, acknowledge said instrument to be the free act and deed of said City of Hugo. <br />