My WebLink
|
Help
|
About
|
Sign Out
Home
2018.09.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.09.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:01:06 PM
Creation date
9/14/2018 10:32:08 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
9/17/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility <br />to the manufacturer or a third party for recycling or <br />other appropriate disposal method. <br />Racking, Poles Racking, utility poles, and fencing will be <br />and Fencing dismantled/removed and will be sent to a metal <br />recycling facility. Holes will be backfilled with soil <br />from the Pro1ject facility <br />Wire <br />Conduit <br />Junction Boxes, <br />Combiner <br />Boxes, External <br />Disconnect <br />Boxes, etc. <br />Inverters <br />Concrete Pads <br />Above -ground wire will be sent to a facility for <br />proper disposal and/or recycling. Below -ground wire <br />will be cut back to a depth of two to three feet below <br />grade and abandoned in place. <br />Above -ground conduit will be disassembled at the <br />Project and sent to a recycling facility. <br />The boxes will be sent to an electronics recycler <br />Functioning inverter parts will be re -used. Non- <br />functioning inverters will be sent to the <br />manufacturer or an electronics recycler as <br />applicable. <br />Material from concrete pads will be removed and <br />sent to a concrete recycler. <br />Computers, Computer components will be sent to an electronics <br />Monitors, Hard recycler and functioning parts will be reused. <br />Drives and <br />JSimilar <br />Restoration After all equipment is removed, the Project site will be restored to a <br />and condition similar to its pre -construction use if the Project site will once <br />Reclamation of again be used for agricultural. If holes are created when infrastructure <br />the Site is removed, they will be back -filled and covered with topsoil. Concrete <br />pads and all other equipment will be removed and disposed of as <br />described above. Unless requested otherwise, permanent access roads <br />constructed on the Project will be removed. Topsoil that was stripped <br />and relocated to designated areas on the site during construction will <br />be re -worked to cover exposed subsoils. <br />315 Manitoba Avenue, Suite 200, Wayzata, MN 55391 <br />
The URL can be used to link to this page
Your browser does not support the video tag.