Laserfiche WebLink
EXHIBIT C <br />ESCROWS, FEES AND CHARGES <br />a) Escrow for City Costs and Fees. Developer shall deposit sufficient <br />escrow with the City as outlined in Section A. 1. The required beginning balance in the account is <br />calculated at $28,920.00. This sum is calculated to be four percent (4%) of the estimate of the required <br />improvements to be installed to serve the development. <br />b) Cash Escrow or Letter of Credit. Developer shall provide a financial <br />guarantee to the City, in the form of a cash escrow or letter of credit, in the amount equal to one <br />hundred twenty-five percent (125%) of the estimated amount of the required improvements to be <br />installed to serve the development. This amount has been calculated by the City's Engineer to be $ <br />747,480.00. This amount may be reduced upon request of the Developer and approved by the City. <br />At no point shall the Letter of Credit be reduced below 10% of the original amount. The City shall <br />have the right to retain the financial guarantee until the improvements have been completed to the <br />satisfaction of the City and the warranty period has expired. <br />c) Storm Water Trunk Fee. The Developer shall pay the City a Storm <br />Water Trunk Fee in the amount of $ 150,086.00. This sum is calculated to be $0.03 per square foot <br />for the 5,002,866 square feet of Net Developable Area within the Plat. This fee shall be paid before <br />the Final Plat is signed by the City. <br />d) Storm Water Ponding Fee. Ponding fees are waived since developer is <br />installing onsite ponds. <br />e) Snow Plowing. Developer agrees to pay a cash escrow to the City to <br />cover the cost of snowplowing the roads within the plat, during the first snow season, before the roads <br />are formally accepted by the City of $.50 per lineal foot. The Developer shall post a cash escrow with <br />the City in the amount of $1,145.00 (i.e., $0.50 x 2,290 = $ 1,145). <br />f) Sealcoatin . The Developer shall post a cash escrow with the City in <br />the amount of $9,160.00 to cover the cost of the first sealcoating of the streets in the Plat. This sum <br />is calculated to be $4.00 per lineal foot for the 2,290 feet of streets within the Plat. (i.e., $4.00 x 2,290 <br />_ $ 9,160.00). <br />g) Park Dedication. Developer agrees to pay a park dedication fee of <br />$2,208.00 per lot for the residential development. The fee is reduced because a portion of the fee is <br />satisfied by dedication of land. Said fee shall be due for each of the 13 lots within the plat (i.e. total <br />due $28,704.00). <br />The Preserve on Sunset Lake <br />19 <br />