My WebLink
|
Help
|
About
|
Sign Out
Home
2018.12.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.12.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:49:47 PM
Creation date
11/29/2018 4:20:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/5/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERALNOTES <br />1. LANDSCAPE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE <br />NATURE AND SCOPE OF WORK. <br />2. LANDSCAPE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT <br />DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT, <br />3_ LANDSCAPE CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS GOVERNING THE <br />WORKAND MATERIALS SUPPLIED. <br />4. NOTREES OR SHRUBS TO BE PLANTED IN DELINEATED WETLANU. IDENTIFY WETLAND BOUNDARIES PRIOR TO PLANTING. <br />5. LANDSCAPE CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF UNDERGROUND AND ABOVE GRADE UTILITIES AND <br />PROVIDE THE NECESSARY PROTECTION FOR. SAME BEFORE CONSTRUCTION BEGINS. <br />6. LANDSCAPE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT NEGATIVELY <br />AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY, UNDESIRABLE SITE CONDITIONS SHALL BE BROUGHT TO THE <br />ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF WORK <br />7. LANDSCAPE CONTRACTOR. IS RESPONSIBLE FOR ONGOING MAINTENANCE OF NEWLY INSTALLED MATERIALS UNTIL TIME OF <br />FINAL ACCEPTANCF BY LANDSCAPE ARCHITECT_ REPAIR OF ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO <br />FINAL ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR. <br />PLANTING NOTES <br />S. NO PLANTS WILL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA, <br />B. PROPOSED PLANT MATERIAL SHALL COMPLY WITH THE CURRENT EDITION OF THE AMERICAN STANDARD FOR NURSERY <br />STOCK, ANSI Z50.1, UNLESS NOTED OTHERWISE, DECIDUOUS SHRUBS SHALL HAVE AT LEAST S CANES AT THE SPECIFIED <br />HEIGHT. ORNAMENTAL TREES SHALL HAVE NO 'V CROTCHES AND SHALL BEGIN BRANCHING NO LOWER THAN S FEET ABOVE <br />THE ROOT BALL. STREETAND BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN V ABOVE PAVED SURFACE. <br />10, NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS GRANTED BY THE LANDSCAPE ARCHITECT TO <br />THE LANDSCAPE CONTRACTOR. <br />11. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD. LANDSCAPE ARCHITECT MUST BE <br />NOTIFIED PRIOR TO ADJUSTMENT OF PLANTS. <br />12, PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS. <br />13, WATER ALL PLANT MATERIAL WTHIN 2 HOURS OF PLANTING. APPLY ENOUGH WATER TO THOROUGHLY SATURATE ALL <br />PLANTING SOIL. <br />Coniferous Tree Planting Schedule <br />Symbol <br />Quantity <br />Scientific Name <br />Cannlon Name <br />Size <br />Cont. <br />Type <br />PG <br />158 <br />Pkea gfnuca deesara <br />Black Hills Spruce <br />8' <br />BBB <br />Single Stem <br />JV <br />7B <br />jhniperxi virginiano <br />Eastem red cedar <br />18. <br />BBB <br />Single Stem <br />238 <br />Total <br />LEGEND <br />EASTERN RED CEDAR <br />f��raA�us wgNrierel <br />BLACK HILLS SPRUCE <br />l �qb—� <br />5 <br />SOLAR SITE PLAN <br />1" = 350' (@ 11X17) <br />HEREBY CERTIFY THAT THIS. PLAN, SPECIFICATION, OR REPORT <br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND <br />THAT I AM DULY IC7=NSOFWV <br />A LED PRESSIONAL 050APE <br />ARC-IITEGT UNDERTHE LAWS OF THE STATE OF MINNESOTA <br />�,a <br />SUBMISSION DATE: <br />1c-1U2616 <br />Emmons 6 Olivier <br />R e e E Y r c e ■ , Inc . <br />051 Hals Aver BB Norlh <br />w a t e I Oekdels, MN 55128 <br />e c a I o B y Tele= 651.770.8448 <br />co m m u n N y w w w . e o r i n c . c o m <br />FASTSUN LLC <br />601 CARLSON PKVVlY, STE 1050 <br />MINNETONKA, MN 55305 <br />Fa$t5un LLC, FASTSUN 4 <br />45°11'26.34"N 92°57'24.44"'N% <br />7260 165th Street N <br />Hugo, MN 55038 <br />LANDSCAPE SITE PLAN <br />a <br />DFBIGN BY DRAWN BY <br />BH BH <br />2 <br />1 <br />BRPI TA M. HANSEN <br />DATE'. 101c XIS LICENSE# 53W7 <br />EDR PROJECT NO. <br />1292-MB <br />STATE PROJECT NO. CITY PROJECT NO. <br />SHEET 01 OF 023 SHEETS <br />NO <br />DATE <br />BV' <br />REVISION <br />Figure 3. Proposed Hugo Solar Garden site array layout with delineated wetland impacts. Pink areas represent panel installation or road impacts in higher quality wetland areas and purple areas indicate panel installation or road <br />impacts to low quality wetland area. The linear pink and purple areas along the southwest edge are permanent impact associated with the road (grey solid line). Orange "bricked" area is the laydown yard located in upland. <br />
The URL can be used to link to this page
Your browser does not support the video tag.