Laserfiche WebLink
Ms. Rachel Juba <br />January 19, 2018 <br />Page 2 <br />f. An easement must be established over stormwater management facilities, stormwater <br />conveyances, ponds, wetlands, on-site floodplain up to the 100 -year flood elevation. <br />g. Any offsite drainage must be included in the submitted drainage maps and models. <br />Transportation/ROW <br />1. Access Locations: A single access from Highway 61 is proposed with the sketch plan. This access will <br />require an access permit MnDOT before construction can begin in MNDOT right-of-way. <br />2. Right -of -Way: The site plan should include 39 -ft of right-of-way to be dedicated along the west edge of <br />the site in accordance with the Highway 61 corridor plan. <br />Sanitary Sewer Service <br />1. Sewer Improvements: Sanitary sewer service is available along the east side of the property with a 6" <br />service stub extended into the site. <br />Water Service <br />1. Watermain Improvements: Water service is available by connecting (wet tap) to the existing 6" <br />watermain located along the east side of Highway 61 and the 6" watermain located in Pineview <br />Meadows to allow proper looping of the watermain. A 20 -ft drainage and utility easement over the <br />watermain should be incorporated to allow proper City maintenance. <br />Thank you for the opportunity to comment on this concept plan. If you have any questions or items you wish <br />to discuss, you can contact me at 651-286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Erichson, PE <br />City Engineer <br />Attachment <br />cc: Steve Duff, Senior Engineering Technician, City of Hugo <br />Scott Anderson, Public Works Director, City of Hugo <br />S:�Users�R_Juba �RocheADEVELOPMENT PROJECTS �TGK Auto �TGK Auto Concept Eng Memo 011918.docx <br />