My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 08.23.18
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2018 PC Packets
>
PC Packet 08.23.18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 11:01:01 AM
Creation date
12/6/2018 2:29:44 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/23/2018
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE OF APPROVAL: <br />APPLICANT: <br />PROPERTY OWNER: <br />INTERIM USE PERMIT <br />August 6, 2018 <br />FastSun 4, LLC. <br />601 Carlson Parkway <br />Minnetonka, MN 55305 <br />Linda M. Gregoire <br />264203 1 01h Place <br />Aitkin, MN 56431 <br />PROPERTY ADDRESS: N/A <br />PROPERTY ID: 10.031.21.23.0003 <br />DURATION: Expires in 25 years (timeline beginning at the approval of <br />the final building permit inspection) <br />REVIEW: The permit shall be reviewed eveLy 5 ye <br />ZONING DISTRICT: <br />LEGAL DESCRIPTION: <br />Future Urban Service (FUS) <br />See attached Exhibit A <br />THIS INTERIM USE PERMIT ALLOWS FOR THE FOLLOWING: <br />A solar farm on the property generally located north of 165th Street North and west of <br />Henna Avenue North. <br />THIS INTERIM USE PERMIT IS APPROVED SUBJECT TO COMPLIANCE <br />WITH THE FOLLOWING SPECIAL CONDITIONS: <br />1. A building permit shall be required for the erection of the solar farm. <br />2. The solar farm shall operate in a manner that is consistent with applicant's <br />narrative (Exhibit SAB) and applicant's site plan (Exhibit CB). <br />3. The solar farm owner/operator shall abide by the decommissioning plan (Exhibit <br />DE) and decommission plan City standards outlined in Section 90-278. <br />4. The solar farm shall not permit light, glare, noise, odor, smoke, dust, or vibration <br />that will in any way have an objectionable effect upon adjacent or nearby property <br />owners. <br />5. It shall be the responsibility of the property owner to secure any solar energy <br />easements, if applicable, to protect solar access for the system (as per MN Statute <br />Section 500.30). <br />6. A small sign will be allowed at the entrance of the site to display the site address, <br />emergency contact information, and emergency procedures. A permit for any <br />sign installed on site will require review and approval of a sign permit application <br />by the Community Development Director or designee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.