My WebLink
|
Help
|
About
|
Sign Out
Home
EDA Packet 12.19.17
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2017 EDA Packets
>
EDA Packet 12.19.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 4:23:08 PM
Creation date
12/7/2018 3:03:50 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/19/2017
Document Type
Agenda/Packets
Commission Name
EDA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ensure Infrastructure is Provided to Meet Business Needs <br />It is important for the City to implement the improvements identified on <br />the City's infrastructure plans illustrated in Chapters 8, 9, 10 and 11 of <br />this document. The important transportation connections and sewer <br />and water improvements that are necessary to accommodate existing <br />and future businesses have been taken into account and are shown in <br />this comprehensive plan. <br />The BNSF rail line serving the Bald Eagle Industrial Park is an <br />important transportation element for existing businesses located there. <br />The rail line should be maintained as long as the businesses rely on it. <br />The City should encourage the eventual conversion of the rail line <br />along TH 61 to a transit corridor that may accommodate both freight <br />and passengers. Provisions for transit will provide businesses with <br />expanded access to the area's workforce. Higher intensity mixed use <br />development and retail development should be encouraged along the <br />transit corridor. The City will cooperate with the Rush Line Corridor <br />Task Force to implement recommended improvements along the <br />corridor. <br />The transportation plan illustrates a future interchange at County <br />Road 4 and 1-35E. The interchange is also identified on MnDOT's <br />Inter -Regional Corridor Plan for 1-35. The timing of the construction <br />of this interchange is critical in implementing the plans for business <br />development in northern Hugo. The City should continue to lobby for <br />the accelerated construction of the interchange though the 1-35 W/E <br />Coalition. <br />The City will locate new commercial businesses where municipal <br />utilities are available. Urban services will be made available to the <br />areas guided for business development in accordance with the City's <br />sewer and water plans. <br />The City will strive to ensure that telecommunications needs are met <br />for new or existing businesses. The City will evaluate how fiber optic <br />lines or other telecommunication technology can be extended and <br />used in areas where businesses are located or plan to locate. <br />HUGO 2040 COMPREHENSIVE PLAN UPDATE ECONOMIC COMPETITIVENESS 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.