My WebLink
|
Help
|
About
|
Sign Out
Home
EDA Packet 12.19.17
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2017 EDA Packets
>
EDA Packet 12.19.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 4:23:08 PM
Creation date
12/7/2018 3:03:50 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/19/2017
Document Type
Agenda/Packets
Commission Name
EDA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation Planning Context <br />Transportation facilities should effectively serve land uses which the <br />City supports and/or anticipates. The remainder of this chapter was <br />prepared with the goal of supporting the land -use vision identified <br />and discussed in Chapter x. Other aspects of the planning context <br />are studies that the City has performed such as the Downtown <br />Redevelopment Study, the County Road 8 Corridor Plan, and the TH <br />61 Corridor Plan. <br />A key aspect of transportation planning is effective coordination <br />between different governmental agencies as transportation authorities <br />In the case of Hugo, this includes the Metropolitan Council, Mn/ <br />DOT, Washington County, and neighboring communities. As part of <br />the process of preparing this transportation chapter, transportation <br />planning documents prepared by other agencies were reviewed and <br />considered. This included the following: <br />• Metropolitan Council 2040 Transportation Policy Plan <br />• MnDOT Statewide Transportation Plan <br />• Washington County Transportation Plan <br />• Anoka County Transportation Plan <br />• Transportation plans of adjacent communities (Lino Lakes, <br />Forest Lake, Grant, and White Bear Township) <br />• TH 61 Corridor Memorandum of Understanding <br />Previous Transportation Plan <br />The previous Hugo Transportation Plan was prepared in 2008. The <br />work included as part of this chapter has used that document as a <br />base. <br />DRAFT Dec14-17 <br />for review only <br />HUGO 2040 COMPREHENSIVE PLAN UPDATE TRANSPORTATION 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.