My WebLink
|
Help
|
About
|
Sign Out
Home
EDA Packet 12.19.17
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2017 EDA Packets
>
EDA Packet 12.19.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 4:23:08 PM
Creation date
12/7/2018 3:03:50 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/19/2017
Document Type
Agenda/Packets
Commission Name
EDA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Treatment and Storage <br />Capacity <br />The City of Hugo does not currently have a water treatment plant. <br />Hugo's water quality meets all primary contaminant standards and <br />treatment is not mandated. Water from all wells is chlorinated and <br />fluoridated as required by the Minnesota Department of Health. In <br />addition, polyphosphate is added to keep iron and manganese in <br />solution. <br />There are two elevated storage facilities serving the City of Hugo's <br />water system with a total storage capacity of 2 Million Gallons (MG). <br />The City is divided into two pressure zone systems, a northern and a <br />southern system, with a tower located within each area. The elevated <br />storage tanks are shown in Map 9-1 which details the City of Hugo <br />existing water supply system. <br />Tower No. 2, which serves the southern portion of the water system, is <br />a water spheroid tower with 0.5 MG of available storage. This tower <br />is located south of County Road 8 and West of Trunk Highway 61. <br />Tower No. 3, which serves the northern portion of the water system, is <br />a composite water tower in which the pillar is constructed of concrete <br />and the storage tank of steel. Tower No. 3 has 1.5 MG of available <br />storage and is located north of 159th Street and west of Trunk <br />Highway 61. <br />} <br />2040 COMPREHENSIVE PLAN UPDATE COMPREHENSIVE WATER SUPPLY 208 <br />0-awC <br />AND DISTRIBUITION PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.