My WebLink
|
Help
|
About
|
Sign Out
Home
EDA Packet 12.19.17
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2017 EDA Packets
>
EDA Packet 12.19.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 4:23:08 PM
Creation date
12/7/2018 3:03:50 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/19/2017
Document Type
Agenda/Packets
Commission Name
EDA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preventative Maintenance <br />Longterm preventative programs and measures for the City's existing <br />water system will help reduce the risk of emergency situations. The <br />City of Hugo staff has a number of programs to help reduce these <br />risks. <br />The well pumps are critical to the system's supply and do wear out <br />with time due to their extensive use. Public Works Operations staff <br />checks pump oil, bearings, and packing each weekday. Staff changes <br />the pump oil in the spring and fall of each year. Well pumps are <br />annually inspected by a well contractor to ensure proper operation. <br />Annual well functions inspected include voltage, flow rate, vibration, <br />water level, and other maintenance issues. In addition, pumps are <br />pulled and serviced, rebuilt, or replaced as necessary every seven <br />years. <br />The water distribution system components are inspected and replaced <br />when appropriate as part of the City's annual street reconstruction <br />projects. Fire hydrants are flushed twice a year and gate valves are <br />periodically exercised to confirm they are in proper working order and <br />to identify issues within the distribution system. Storage facilities are <br />cleaned and inspected every five years and repainted as necessary. <br />jF•• <br />1 .• i 'Y 4�_p�'J-L�•Fr ri•�.a _}{�—�-y`�� <br />M ,- <br />- •���77J <br />c <br />2040 COMPREHENSIVE PLAN UPDATE COMPREHENSIVE WATER SUPPLY 214 <br />0-awC <br />AND DISTRIBUITION PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.