My WebLink
|
Help
|
About
|
Sign Out
Home
EDA Packet 01.16.18
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2018 EDA Packets
>
EDA Packet 01.16.18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:27:27 PM
Creation date
12/7/2018 3:19:26 PM
Metadata
Fields
Template:
Commissions
Meeting Date
1/16/2018
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TGK Automotive, Sketch Plan <br />Page 4 <br />Architecture <br />The building is not simply a square and can provide some interest as the architecture comes <br />together. The applicant has provided elevations, renderings, and an example of what they <br />envision the building will look like. The applicant has stated the majority of the building material <br />would be brick. The entrance will be defined and the overhead doors do not dominate the <br />appearance of the building. Staff recommends the applicant further break up the large building <br />walls with additional architectural details and windows. All roof top and ground mounted <br />mechanical equipment are required to be screened. The applicant will be required to meet the <br />commercial and industrial construction standards and design guidelines. All of these items will <br />be worked through with a formal site plan application submittal. <br />3. CONCLUSION/RECOMMENDATION: <br />The applicant has provided a sketch plan for the EDA to review. The applicant would like <br />feedback on the site plan, architecture, and rezoning of the property. <br />There are details on the plan that have not been fully evaluated since this is a sketch plan <br />application. At the time a site plan application is submitted, they will be further evaluated with <br />additional information that will be required. It's in staff's opinion that the important question is <br />the rezoning of the property from NS to C-2. If the EDA is comfortable with the rezoning, they <br />should discuss items that are important to general layout and the how the property is used in <br />regards to transitions between uses. <br />Attachments: <br />1. Location Map <br />2. Zoning Map <br />3. Sketch Plan <br />4. Renderings of Buildings <br />5. Example of Building Exterior <br />
The URL can be used to link to this page
Your browser does not support the video tag.